Battery storage · United Kingdom
Greenburn Wind Park
Operator REG Windpower Limited
Awaiting Construction10 MWData checked 16 November 2026Source record dated 13 December 2024
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Greenburn Wind Park is a 10 MW battery storage site 5.6 km south of Cumnock, Strathclyde, United Kingdom. Its planning application (ECU00002037) went to Scottish Government (S36) on 27 March 2020 and was granted on 21 April 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Greenburn Wind Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
REG WINDPOWER LIMITED (02431173), active, since 1989. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Greenburn Wind Park sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 240 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 240 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 326 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 438 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- REG Windpower Limited
- Location
- Land Adj Former Opencast, Greenburn Wind Park, New Cumnock, Cumnock, Strathclyde, Strathclyde, KA18, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00002037
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00002037, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 27 March 2020 Planning application submitted
- 21 April 2023 Planning permission granted
- 21 April 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Greenburn Wind Park. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Greenburn Wind Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Greenburn Wind Park; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Greenburn Wind Park?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 December 2024.
- Where is Greenburn Wind Park?
- 5.6 km south of Cumnock, Strathclyde, United Kingdom (postcode KA18).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).