← Back to Strathclyde
Planning pack for this site, £295Other options

Solar · United Kingdom

Kilmarnock Academy, Elmbank Drive - Solar PV System

Operator Centrestage Communities Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 29 November 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kilmarnock Academy, Elmbank Drive - Solar PV System is a 0.2 MW solar farm in Kilmarnock, Strathclyde, United Kingdom. Its planning application (23/0533/PP) went to East Ayrshire on 5 October 2023 and was granted on 24 November 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 30 other energy sites within 10 km, 10 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kilmarnock Academy, Elmbank Drive - Solar PV System sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1238, Leak from solar heating system at Carnegie Leisure Centre Dunfermline, 82 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline82 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School109 kmSignificant
EIR-14762026House fire reported to have started on solar panels in Carnoustie149 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Centrestage Communities Limited
Location
Kilmarnock Academy, 15 Elmbank Drive, Kilmarnock, Strathclyde, KA1 3BS, United Kingdom
Planning authority
East Ayrshire
Planning application
23/0533/PP

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0533/PP, with what the planning evidence pack adds for this site.

Every application in East Ayrshire · Alerts for applications and incidents near here

  • 5 October 2023 Planning application submitted
  • 24 November 2023 Planning permission granted
  • 24 November 2026 Planning permission runs out

None found. The register holds no published incident that names Kilmarnock Academy, Elmbank Drive - Solar PV System. If you know of one, report it (confidential reports are anonymised).

Has Kilmarnock Academy, Elmbank Drive - Solar PV System had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kilmarnock Academy, Elmbank Drive - Solar PV System; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kilmarnock Academy, Elmbank Drive - Solar PV System?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 November 2023.
Where is Kilmarnock Academy, Elmbank Drive - Solar PV System?
In Kilmarnock, Strathclyde, United Kingdom (postcode KA1 3BS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).