Refused on 12 March 2025. The evidence pack for a decided application is free to read in full. It is made from the register as it stands today, not as it stood when the application was decided. Every decided application · Order a pack for a live application

Download the PDF Word version About the pack

Energy Incident Register · Planning evidence pack

Incident evidence for Kent Medway Adolescent Hospital - Ground Mounted Solar Panels

Technology
0.2 MW solar PV
Location
Woodland House, Winthrop Hall, Cranbrook Road, Staplehurst, Tonbridge, Maidstone, United Kingdom
Planning authority
Maidstone
Application
24/503785/FULL
Pack reference
EIR-PACK-D-KENT-MEDWAY-ADOLESCENT-HOSPITAL-GROUND-M
Data as of
29 October 2026
Review
Made automatically for a decided application, free to read. Not desk-reviewed.

Made from the register on 29 October 2026, when it was opened. Free to read: this application was decided (refused, 12 March 2025). Made today from the register as it stands now; it is not the evidence that was before the decision.

At a glance

solar PV incidents in the UK
96 4 classed as major. Section 2.
Nearest UK incident
50 km EIR-1303, Prince Edward's Road, Wallands Park. Section 2.
Nearest refused scheme
2.4 km Land At Pullen Farm, Tunbridge Wells. Section 3.
Schemes refused within 40 km
16 final outcome refused, of 29 sites with a refusal, withdrawal or appeal. Section 3.
Schemes taken to appeal
15 7 refused on appeal, 1 appeal withdrawn, 7 granted on appeal. Section 3.

1. Key findings for this site

Counts are of incidents in the register, which is built from published reporting. They are not rates and not a complete census.

2. Incidents in the UK (96)

Nearest to the site first. Distance is a straight line from the site point to the place the entry is mapped to (a town or a site).

ReferenceYearIncidentFrom the siteSeverityMW
EIR-13032017Solar panel inverter fault destroys two Lewes homes provisional50 kmSignificant
EIR-15302023Electrical fault causes solar panel fire in Wickford house52 kmMinor
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London53 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel provisional53 kmSignificant
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers provisional55 kmMinor
EIR-15122024Solar panels involved in fire at school in Carshalton provisional55 kmMinor
EIR-24472024Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton56 kmMinor
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean56 kmMinor
EIR-15222026Fire damages roof with one solar panel in The Charltons provisional57 kmMinor
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet provisional58 kmSignificant
EIR-15142024Garage fire destroys solar panels in Southgate, with a battery storage fault suspected provisional72 kmMinor
EIR-11702025Rooftop solar panels catch fire at IKEA store in Wembley74 kmSignificant
EIR-22232023Homeowners allege solar panel fault caused Tolleshunt Knights house fire provisional74 kmMajor
EIR-07742023Solar panel fire destroys roof of Ealing Council house in Greenford77 kmMajor
EIR-25892022Rooftop solar panels reported to have overheated and sparked fire at Colchester church provisional85 kmSignificant
EIR-14222025Firefighters tackle solar panel fire in Yapton provisional90 kmMinor
EIR-20852020Fire involving solar panels at a house in Barnham, West Sussex provisional91 kmMinor
EIR-15312022Fire involving solar panels damages roof of flats in Fleet provisional98 kmSignificant
EIR-15192025Solar panels involved in outbuilding roof fire in Bourne End provisional100 kmMinor
EIR-12732022Solar panels believed to have started roof fire at house in Old Basing provisional112 kmMinor
EIR-20762020Fire across four homes in Leigh Park most likely linked to solar panel equipment, fire service says provisional113 kmSignificant
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium provisional120 kmMinor
EIR-15292023Fire contained to solar panels on Gosport flats roof provisional124 kmMinor
EIR-14932026Solar panels catch fire on Bedford warehouse roof provisional130 kmMinor
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats provisional135 kmMinor
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough provisional154 kmSignificant
EIR-15452024Fire involving solar panels on a building under construction in Kettering provisional165 kmMinor
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof provisional168 kmSignificant
EIR-25222021Lowestoft school evacuated after electrical fire involving solar panels169 kmMinor
EIR-19642022Fire damages solar panels at Verwood farm during heatwave provisional173 kmSignificant
EIR-15162025Solar panels suspected in house roof fire in Ferndown provisional175 kmSignificant
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown provisional176 kmSignificant
EIR-15542026Fire involving solar panels at a Market Harborough house spreads to an adjoining property provisional181 kmSignificant
EIR-13962024Solar panel fire leads to Travelodge evacuation in Poole provisional182 kmMinor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire183 kmSignificant23
EIR-21092015Solar installer falls through fragile farm roof at Kemble, suffering brain injuries provisional188 kmMajor
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge provisional199 kmSignificant
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine provisional211 kmMinor
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton provisional213 kmSignificant
EIR-12652024Solar panels catch fire and destroy three buildings in Harby216 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol provisional220 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels provisional221 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol provisional221 kmSignificant
EIR-12722022Fire in solar panel distribution board at Birmingham college provisional222 kmMinor
EIR-25232020Suspected solar panel fault sparks roof fire at Ombersley home provisional230 kmSignificant
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton provisional236 kmMinor
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea provisional247 kmMinor
EIR-15512019Fire involving solar panels on a garage roof in Shropshire provisional263 kmMinor
EIR-01722026Fire at Wheat Leasows solar farm in Telford involves an electricity pylon provisional271 kmMinor
EIR-14682026Solar panels involved in fire that destroyed a Sidmouth bungalow provisional271 kmMajor
EIR-15472025Small fire within a solar panel at a house in Shropshire provisional276 kmMinor
EIR-15502021Small fire involving solar panels at a property in Clun provisional276 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall provisional279 kmMinor
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster provisional280 kmSignificant
EIR-14862026Fire under solar panels at Broadclyst brought under control provisional283 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent283 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire provisional286 kmMinor
EIR-15232026Fire damages solar panel batteries in a Teignmouth garage provisional293 kmMinor
EIR-15352022Fire involves roof and solar panels at a house under construction in Dittisham provisional305 kmMinor
EIR-15332022Solar panel fault causes fire at village hall roof in Cheriton Bishop provisional308 kmSignificant
EIR-15362020Inverter fire at a solar farm at East Langford, Kilkhampton provisional313 kmMinor
EIR-15172025Solar inverter fire spreads to field in Yealmpton provisional331 kmMinor
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school provisional334 kmSignificant
EIR-11752026Rooftop solar panel fire guts NHS mental health ward in Malton345 kmSignificant
EIR-15412015Transformer unit fire at a solar farm on Copshorn Road, Bodmin provisional378 kmMinor
EIR-15442014Fire at solar panel installation near Bodmin Jail378 kmMinor
EIR-15282023Fire at solar farm conversion unit in Roche extinguished388 kmMinor
EIR-15212026Solar panels on flat roof alight at terraced building in Newquay provisional403 kmMinor
EIR-15392015Solar panel blown off bungalow roof onto vehicle in Newquay provisional403 kmMinor
EIR-15382020Solar panels blown off roof in storm at Newquay provisional404 kmMinor
EIR-04742025Solar panel fire tackled on rooftop near Newquay beach405 kmMinor
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey provisional406 kmMinor
EIR-07522024Storm Darragh damages newly commissioned Anglesey solar farm panels provisional409 kmSignificant49.99
EIR-15402018Fire in solar panel on house roof in Flushing provisional411 kmMinor
EIR-15022025Storm Eowyn damages solar panels at Newton Aycliffe Leisure Centre provisional412 kmMinor
EIR-15432017Fire damages roof space and solar panels on bungalow in Crowan427 kmSignificant
EIR-14992025Solar panels linked to fires at council buildings in Northumberland461 kmSignificant
EIR-20162022Solar panel fire evacuates Hawick High School provisional525 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline provisional608 kmMinor
EIR-14762026House fire reported to have started on solar panels in Carnoustie provisional632 kmSignificant
EIR-15482026Solar inverter fire on agricultural building in Shropshire provisionalnot mappedMinor
EIR-15202026Fire in home battery storage system connected to solar panelsnot mappedMinor
EIR-14452026Solar panel fires prompt shutdown at Suffolk schoolsnot mappedSignificant
EIR-11332026Poor installation blamed for two inverter fires at UK care home solar array provisionalnot mappedMinor0.101
EIR-15182025Roof fire damages flats with solar panels in Jordansnot mappedSignificant
EIR-14632025Serious fire at St Martins School near Oswestry believed linked to solar panels provisionalnot mappedSignificant
EIR-15252025Smoke reported from solar panels on an industrial unit in Horningtops provisionalnot mappedSignificant
EIR-15152023House and outbuilding fire in Cricklewood, with PV Stop used on rooftop solar panels provisionalnot mappedMinor
EIR-11742023Rooftop solar panel fault sparks fire at Kent flats blocknot mappedSignificant
EIR-24832023Rooftop solar array suspected in house roof fire at Horsell Common, Surrey provisionalnot mappedSignificant
EIR-22062023Firefighters isolate solar farm substation after smoke in Devon provisionalnot mappedMinor
EIR-15552021Fire in a domestic outbuilding in Oswaldkirk believed linked to a solar battery provisionalnot mappedMinor
EIR-09482020Fire damages floating solar array on London reservoir provisionalnot mappedSignificant6.4
EIR-25262019Fire on roof of Bulford St Leonard's Primary School linked to newly installed solar panels provisionalnot mappedMinor
EIR-23832018House fire near St Austell suspected of starting from solar panels provisionalnot mappedSignificant
EIR-15422015Fire at transformer building on solar farm in Treviscoenot mappedSignificant

3. Planning decisions on solar PV schemes nearby

Sites within 40 km of the site where an application was refused, withdrawn or taken to appeal, from the government's Renewable Energy Planning Database, those in Maidstone first. Each row is one site: a refused scheme that was sent in again is one row, with every application listed. The final outcome is that of the latest application. Schemes under 1 MW are listed apart, below the table. Councils with a scheme in this radius: Maidstone, Tunbridge Wells, Rother, Ashford, Tonbridge and Malling, Swale, Medway, Sevenoaks, Wealden, Folkestone and Hythe, Hastings, Canterbury, Gravesham, Dartford, Tandridge, Thurrock, Mid Sussex. The database does not record the reasons for a decision; the council's planning record does, under the application number.

SiteCouncilApplicationsFinal outcomeMWFrom the site
Great Pagehurst FarmMaidstone13/1456: submitted 19 Sep 2013, refused 11 Feb 2016, appeal lodged 22 Apr 2016, appeal refused 10 Apr 2017Refused on appeal13.63.7 km
Great Tong Solar FarmMaidstone15/505974/FULL: submitted 24 Aug 2015, refused 29 Feb 2016, appeal lodged 21 Dec 2016, appeal withdrawn 10 Jan 2017Appeal withdrawn4.96.5 km
Eckley Farms, Marden - Solar Energy FarmMaidstone22/501335/FULL: submitted 1 Jun 2022, refused 28 Oct 2022, appeal granted 5 Feb 2024, granted 5 Feb 2024Granted on appeal49.96.9 km
Land At Pullen FarmTunbridge Wells15/503884/FULL: submitted 30 Jun 2015, refused 24 Mar 2016, appeal lodged 16 Dec 2016, appeal refused 25 Aug 2017Refused on appeal102.4 km
Maidstone Road, Horsmonden - Paddock Solar FarmTunbridge Wells22/02773/FULL: submitted 20 Sep 2022, refused 19 Dec 2022, granted 5 Sep 2023Refused49.98.4 km
Netters Farm, Attwaters Lane - Solar Pv ArrayTunbridge Wells22/01695/FULL: submitted 28 Jun 2022, withdrawn 22 Sep 2022
23/02067/FULL: submitted 30 Aug 2023, withdrawn 30 Aug 2023
24/01767/FULL: submitted 18 Jul 2024, refused 1 May 2025
Refused
3 applications
108.9 km
Lower Ellenden Farm, Water Lane - Solar PanelsTunbridge Wells22/01884/FULL: submitted 14 Jul 2022, withdrawn 22 Sep 2022
23/02059/FULL: submitted 30 Aug 2023, withdrawn 1 Dec 2023
24/01768/FULL: submitted 18 Jul 2024, refused 1 May 2025
Refused
3 applications
610 km
Capel Grange Solar ParkTunbridge Wells14/00271/FULL: submitted 3 Feb 2014, refused 15 Sep 2014
14/506168/FULL: submitted 12 Dec 2014, granted 10 Apr 2015
Granted after resubmission
2 applications
6.6 to 10.414 km
Land South of Dowle StreetAshford13/00789/AS: submitted 30 Jul 2013, refused 26 Feb 2014, appeal lodged 1 Apr 2014, appeal refused 23 Jun 2015Refused on appeal915 km
Oaklands FarmAshford13/01022/AS: submitted 12 Sep 2013, refused 23 Dec 2013
14/00326/AS: submitted 24 Mar 2014, granted 20 Jun 2014
Granted after resubmission
2 applications
6.9 to 11.417 km
Harp Farm - Solar ParkSwale25/502166/FULL: submitted 12 Jun 2025, refused 30 Apr 2026Refused1518 km
Kenardington Place FarmAshford13/01074/AS: submitted 7 Oct 2013, refused 23 Jan 2014, appeal granted 15 Sep 2014, granted 15 Sep 2014Granted on appeal720 km
Vigo Lane, Borden - Solar FarmSwale23/502210/FULL: submitted 5 May 2023, refused 9 Aug 2024, appeal granted 1 Sep 2025, granted 1 Sep 2025Granted on appeal4021 km
Bobbing solar farmSwaleSW/14/0525: submitted 6 May 2014, refused 20 Oct 2014, appeal lodged 22 Jun 2015, appeal granted 7 Dec 2015, granted 7 Dec 2015Granted on appeal11.325 km
Littles Manor FarmSwaleSW/13/0832: submitted 19 Jul 2013, refused 22 Nov 2013, appeal lodged 5 Feb 2014, appeal refused 7 May 2014Refused on appeal9.528 km
Maritime Way, Gillingham - Solar PanelsMedwayMC/22/0526: submitted 28 Feb 2022, refused 31 May 2022Refused28 km
Catsfield Solar FarmRotherRR/2014/1664/P: submitted 24 Jul 2014, refused 25 Nov 2014
RR/2015/142/P: submitted 23 Jan 2015, refused 9 Apr 2015, appeal lodged 13 Jul 2015, appeal refused 17 Feb 2016
RR/2015/1745/P: submitted 10 Jul 2015, appeal lodged 8 Apr 2016, refused 10 Oct 2016, appeal refused 10 Oct 2016
Refused on appeal
3 applications
3.8 to 1229 km
Partridge FarmAshford14/00398/AS: submitted 28 Apr 2014, refused 22 Jul 2014, appeal lodged 18 Feb 2015, appeal granted 6 Oct 2015, granted 6 Oct 2015Granted on appeal10.630 km
West KingdownSevenoaks13/02487/FUL: submitted 15 Aug 2013, withdrawn 8 Nov 2013Withdrawn2030 km
North Court Farm, Chilham - Solar FarmAshfordPA/2022/2415: submitted 25 Oct 2022, refused 18 Apr 2024, appeal refused 31 Oct 2025Refused on appeal4431 km
Chimmens Solar FarmSevenoaks23/03181/FUL: submitted 19 Dec 2023, refused 23 Jul 2024Refused49.932 km
Cleve Hill Solar ProjectThe Planning Inspectorate - National InfrastructureEN010085: submitted 16 Nov 2018, refused 28 May 2020, granted 29 Jan 2021Refused37333 km
Skinners FarmSevenoaks14/01270/FUL: submitted 20 May 2014, withdrawn 19 Aug 2014
14/03361/FUL: submitted 28 Oct 2014, refused 8 Jan 2015, appeal lodged 1 Jun 2015, appeal refused 15 Dec 2015
Refused on appeal
2 applications
633 km
Barvills Solar FarmThurrock14/01124/FUL: submitted 21 Oct 2014, withdrawn 16 Mar 2015
15/00288/FUL: submitted 19 Mar 2015, granted 7 Aug 2015
Granted after resubmission
2 applications
5 to 11.637 km
Worsted FarmMid SussexDM/15/3056: submitted 15 Sep 2015, refused 24 Dec 2015, appeal lodged 27 Jun 2016, appeal granted 21 Nov 2016, granted 21 Nov 2016Granted on appeal538 km
Land at Barrow Green FarmTandridge2014/1014: submitted 18 Jul 2014, refused 24 Oct 2014, appeal lodged 17 Sep 2015, appeal refused 30 Mar 2016
2015/57: submitted 13 Jan 2015, refused 25 Feb 2015
Refused
2 applications
5 to 1539 km
Nackington Farm Solar Park- Site BCanterburyCA//14/00085: submitted 31 Jan 2014, withdrawn 1 Sep 2014
CA//14/00087: submitted 31 Jan 2014, withdrawn 1 Sep 2014
CA//14/00086: submitted 31 Jan 2014, withdrawn 1 Sep 2014
Withdrawn
3 applications
11 to 16.639 km
The Place Solar FarmThurrock14/01278/FUL: submitted 9 Dec 2014, refused 25 Nov 2016Refused23.239 km
Bentley EstateWealdenWD/2014/1245/MAJ: submitted 20 Jun 2014, refused 28 Aug 2014, appeal lodged 23 Mar 2015, appeal granted 23 Jul 2015, granted 23 Jul 2015Granted on appeal539 km

Under 1 MW, kept apart (11): Sainsburys Supermarkets, Station Road (Maidstone, refused, 2.3 km); Lockmeadow Centre, Barker Road (Maidstone, withdrawn, 14 km); Northpoint, Compass Park (Rother, refused, 18 km); Balfour Beatty Rail Plant, Old Railway Works (Ashford, refused, 24 km); Nizels Golf Club, Nizels Lane (Tonbridge and Malling, refused, 25 km); St Julians, St Julians Road (Sevenoaks, withdrawn, 26 km); Mid Kent College, Medway Road (Medway, granted after resubmission, 27 km); Ashburnham Place, Ashburnham (Rother, granted after resubmission, 29 km); HM Prison Swaleside, Brabazon Road (Swale, withdrawn, 34 km); Oakwood Business Park, Golden Cross (Wealden, withdrawn, 38 km); The Mcindoe Centre, Holtye Road (Mid Sussex, granted after resubmission, 39 km).

All solar PV applications within 40 km by database status: Awaiting Construction 123, Operational 36, Application Submitted 24, Revised 14, Application Refused 13, Application Withdrawn 8, Appeal Refused 7, Under Construction 3, Appeal Withdrawn 1. A "council record" mark means the council's own planning record shows a decision the government database did not yet have; the site page explains it. A "newer official status" mark means an official source (a council record or committee minutes, the Scottish Government or the Planning Inspectorate) shows a newer status than the government database; the outcome uses it, and the row names the source and the day it was checked.

4. Every recorded incident within 50 km

Measured on a map from the planning record for Kent Medway Adolescent Hospital - Ground Mounted Solar Panels. Every size of site is included here, so a home battery fire nearby is shown, marked as such. Entries are found by their map point only, never by matching words in the text. 16 UK entries have no map point yet and cannot be measured.

ReferenceYearIncidentFrom the siteKind of site
EIR-13032017Solar panel inverter fault destroys two Lewes homes provisional50 kmGrid-scale site

5. Grid-scale incidents at sites of a similar size

Sites between 0.1 and 0.4 MW, worldwide, newest first. Capacity is the site's, where the reporting gives it.

ReferenceYearIncidentCountrySeverityMW
EIR-11332026Poor installation blamed for two inverter fires at UK care home solar array provisionalUnited KingdomMinor0.101
EIR-09822019Lightning strike damages distribution panel at Mabaruma Solar Farm, GuyanaGuyanaMinor0.4

6. Lessons for a grid-scale site

The lessons written into the register's entries: every UK grid-scale incident first, then major grid-scale incidents elsewhere. No home battery lessons. Each is the register's reading of the published reporting, not a finding by an investigator.

  1. A fire that starts in rooftop solar equipment can involve the whole roof and destroy a dwelling before crews arrive. EIR-1468
  2. Limited water supply can force crews to prioritise protecting neighbouring buildings. EIR-1468
  3. Smoke from a roof fire can affect the surrounding area even after occupants have left. EIR-1468
  4. Solar panels removed and reinstalled after roof repairs must be checked by a qualified installer before reconnection. EIR-0774
  5. Smoke in a loft with rooftop solar should prompt checks on the installation rather than dismissal as external. EIR-0774
  6. A fire in rooftop solar can require isolation of panels on nearby roofs using specialist coatings. EIR-0774
  7. Solar installations should be checked for electrical faults, connector quality and panel damage at commissioning and after any roof work, and the records kept. EIR-2223
  8. Where a fire may involve a solar system, the system should be isolated and its components preserved for independent examination, since destruction of evidence can prevent the cause being established. EIR-2223
  9. Installers and contractors working on the same roof should agree and document responsibility for electrical work, so that faults can be traced if a dispute follows. EIR-2223
  10. Treat every roof with skylights or fragile sheeting as a fall hazard and fit collective protection, such as netting or covers, before solar installation starts. EIR-2109
  11. Do not rely on harnesses unless there are enough for every worker, the lanyards reach every work position and workers are trained to use them. EIR-2109
  12. Novice workers need formal training and close supervision before working at height, not only shadowing. EIR-2109
  13. Keep the risk assessment on site and make sure the method of work used matches it. EIR-2109
  14. Take the customer's safety concerns seriously and record why any suggested control is not adopted. EIR-2109
  15. A fire under solar panels can spread quickly over a large area and may need many appliances. EIR-1486
  16. Early requests for more resources, and the use of hose reels, beaters, a drone and a water bowser, were part of bringing this fire under control. EIR-1486
  17. Rooftop solar panels on occupied buildings need regular inspection to spot electrical or thermal faults before ignition. EIR-1175
  18. Fire damage to solar panels can destroy evidence, so operators should retain inverter telemetry for later analysis. EIR-1175
  19. Fire safety systems must cover renewable energy equipment on healthcare sites to allow safe evacuation. EIR-1175
  20. Confirm isolation of the building electricity supply and any solar PV system early, and record what has actually been isolated. EIR-1554
  21. Reassess roof and gable stability when fire involves a roof with solar panels, and move crews outside if collapse is a risk. EIR-1554
  22. Check adjoining properties quickly when fire has spread from a roof. EIR-1554
  23. Treat a reported fire that starts on solar panels as involving live electrical equipment until isolation is confirmed. EIR-1476
  24. Make isolation points easy for crews to find at a home with rooftop solar. EIR-1476
  25. Do not treat a headline as a cause finding; wait for a fuller account before drawing wider conclusions. EIR-1476
  26. Residential solar systems need thermal protection and monitoring that remain effective in hot weather. EIR-1448
  27. Nearby residents should be told promptly what a fire investigation has and has not established, so they can judge whether to isolate similar equipment. EIR-1448
  28. Roof ventilation and electrical connections on new-build homes should be checked at commissioning and after extreme heat. EIR-1448
  29. Roof-mounted solar panels can contribute to school fires, so operators should isolate similar systems from 2011 to 2016 until checked. EIR-1445
  30. Multiple roof fires at solar sites require county-wide isolation even without a confirmed common fault. EIR-1445
  31. Before working on a roof fitted with solar PV, crews should isolate the electrical supply and other utilities, as was done here. EIR-1518
  32. A roof fire in an apartment building can damage neighbouring flats by fire and by water used in firefighting, so occupied units next to the seat of the fire need early attention. EIR-1518
  33. Building managers should keep solar isolation points known and accessible so fire crews can make the roof electrically safe without delay. EIR-1518
  34. Rooftop solar fires on large retail buildings require turntable ladders for access, so operators should ensure local fire services have suitable height equipment. EIR-1170
  35. Fires in elevated solar arrays can spread to the roof structure, so owners should fit early detection and isolation systems. EIR-1170
  36. Visible smoke from rooftop solar fires prompts large-scale evacuations, so stores must plan rapid public safety measures. EIR-1170
  37. Building operators should be able to tell fire crews where rooftop solar equipment is and how it can be isolated, even when the cause is not yet known. EIR-1463
  38. A fire in a school hall can escalate quickly. Early extra resources and roof access matter where solar arrays are fitted. EIR-1463
  39. A suspected link to solar panels should be kept separate from a confirmed cause until the fire service investigation reports. EIR-1463
  40. Review and act on inspection findings from solar panel incidents without delay. EIR-1499
  41. Maintain a programme of proactive inspections for installations predating current standards. EIR-1499
  42. Isolate similar systems across a portfolio when a common fault is suspected. EIR-1499
  43. At a house fire where photovoltaic panels may still generate, isolate the grid supply early and have a means of stopping panel generation available. EIR-1524
  44. A well developed timber-clad roof fire can need many breathing apparatus wearers, thermal imaging and ladder access, so relief and welfare should be planned from the start. EIR-1524
  45. Call the network operator when on-site isolation may not stop generation from the panels. EIR-1524
  46. A suspected solar origin should be recorded as a suspicion until a cause is confirmed. EIR-1516
  47. A roof and first-floor fire at a home with solar panels may need breathing apparatus, hose lines, an aerial appliance and a later reinspection. EIR-1516
  48. Smoke from such a fire may lead the fire service to advise nearby residents to close windows and doors and to close the road for a time. EIR-1516
  49. Treat smoke from rooftop solar panels as a fire involving the array until crews confirm otherwise. EIR-1525
  50. Plan for extra appliances and an aerial platform where panels sit on an industrial roof and spread into the building cannot yet be ruled out. EIR-1525
  51. Record the outcome after the incident, including whether the fire was extinguished and whether it spread, so an attendance note is not read as a finished account. EIR-1525
  52. Lithium-ion battery container fires can spread between enclosures, so operators should verify separation distances and compartment barriers during design reviews. EIR-0058
  53. Smoke from burning battery materials requires advance shelter advice for nearby residents at rural sites. EIR-0058
  54. Unmanned hybrid sites need remote monitoring that identifies involved enclosures before crews arrive. EIR-0058
  55. Rooftop solar on occupied buildings should be installed by qualified contractors from a reputable company and kept on a regular maintenance schedule. EIR-1416
  56. Sites with vulnerable occupants need a plan to move people clear of a roof fire quickly, then confirm the fire is confined before reopening. EIR-1416
  57. A contained roof fire can still disrupt services, so operators should expect cancelled appointments and a follow-up investigation even when no injuries are reported. EIR-1416
  58. A solar farm commissioned in 2024 sustained visible damage from Storm Darragh, so operators should verify panel mounting strength against red warning winds before full output. EIR-0752
  59. Repair work and panel replacement after storm damage will continue into early 2025, so insurers should plan for extended loss of generation on new solar sites. EIR-0752
  60. Rooftop solar on multi-storey buildings needs aerial ladders for access, so operators should plan for this response time. EIR-1173
  61. Live solar panels need de-energising agents such as PVStop before crews can approach safely. EIR-1173
  62. Publish root cause findings so owners of similar residential solar arrays can improve fire safety. EIR-1173
  63. An electrical fault in roof mounted solar panels can start a fire that spreads to nearby buildings, so operators should check wiring and connections on all similar arrays. EIR-1265
  64. A solar panel fire on a workshop roof destroyed three outbuildings before it was put out, so insurers should require clear separation or fire breaks around panel arrays. EIR-1265
  65. Daylight keeps rooftop modules energised after supply isolation, so crews must plan for live dc circuits on arrival. EIR-1155
  66. A fire on a large commercial roof needs aerial access where ground hoses cannot reach. EIR-1155
  67. Connectors and wiring are a known origin of photovoltaic fires, so inspection of those parts should be planned. EIR-1155
  68. A fault in a rooftop solar panel installation can ignite a fire that spreads rapidly through roof spaces, so operators should inspect arrays on multi-occupancy blocks at regular intervals. EIR-1174
  69. Solar panel faults on residential roofs require fire services to plan for rapid roof-space spread and forced entry for evacuation, so pre-incident plans must record array locations. EIR-1174
  70. A fire that starts in rooftop solar panels can spread into the roof insulation, so isolation of the array and access to the roof build-up need to be planned in advance. EIR-1552
  71. A short incident note may not record the cause, injuries or how the fire was stopped, so the operator should keep its own record. EIR-1552
  72. The array and the roof should be inspected before the system is put back into use. EIR-1552
  73. A roof-space fire involving a solar inverter can already be well developed when crews arrive, so detection and access to inverter locations matter. EIR-1532
  74. Extra appliances and breathing apparatus may be needed to put out a roof-space fire involving rooftop solar equipment. EIR-1532
  75. After a roof fire involving solar equipment, the roof structure should be inspected before the building is treated as safe to use. EIR-1532
  76. Owners and installers of roof-mounted solar arrays should have DC wiring, connectors, isolators and junction points inspected periodically, since electrical faults in these circuits can start fires on the roof. EIR-2483
  77. Installers should check that cable routing, fixings and roof penetrations allow for heat and water ingress over the system's life. EIR-2483
  78. Fire and rescue services should record whether a fire involves a solar array, so that patterns can be identified and reported to the installation industry and regulators. EIR-2483
  79. Regular inspection and maintenance of roof mounted solar arrays can identify faults before they ignite. EIR-1533
  80. Fire services should plan for rapid water supply and access when solar panels are present on roofs. EIR-1533
  81. Early detection systems for electrical faults in photovoltaic installations reduce the risk of fire spread. EIR-1533
  82. Rooftop solar arrays on older or heritage buildings should be checked for overheating risk during hot weather, including ventilation around modules and the condition of connections. EIR-2589
  83. Building owners should give the fire and rescue service accurate information about rooftop PV, including where isolation points are, so crews can work safely. EIR-2589
  84. Where a building has suffered a previous fire, the solar installation should be reviewed as part of the fire risk assessment before it is reinstated or expanded. EIR-2589
  85. Rural energy sites need emergency access routes that stay usable when nearby roads are blocked by parked vehicles. EIR-1964
  86. Hot, dry weather raises the chance that a grass fire will spread across a solar farm before crews arrive. EIR-1964
  87. Motorists near energy sites should park so they do not block fire access points. EIR-1964
  88. Where a fire service attributes a roof fire to a likely electrical fault on solar panels, operators should treat rooftop DC connections as a priority for inspection. EIR-1531
  89. A roof fire involving panels can damage several flats even if brought under control within about two hours, so early detection and a clear isolation plan matter. EIR-1531
  90. Aerial access and jets were used here; owners of blocks with rooftop arrays should be ready to tell crews where panels and isolators are. EIR-1531
  91. Occupied buildings with rooftop solar need a practised evacuation plan for a roof fire that produces smoke. EIR-2016
  92. Callers should tell the fire service that solar panels are involved so crews can plan isolation and roof access. EIR-2016
  93. Early official accounts can differ on whether a fire is out. Do not treat an incident as closed on one early statement. EIR-2016
  94. Treat early reports that solar panels appeared to have started a roof fire as unconfirmed until an investigation is complete. EIR-1274
  95. Where a rooftop array is involved, plan for both fire damage and water damage to the building below. EIR-1274
  96. Record how many panels were destroyed and what remains unknown, so later reviews do not treat a suspected cause as established. EIR-1274
  97. Treat rooftop PV on buildings under construction as live equipment from the moment panels are exposed to daylight, and control who works near it. EIR-2069
  98. Commission and test rooftop systems, including connectors and cable routes, before the roof space is closed up, and record the results. EIR-2069
  99. Assess how a fire starting at the array could spread into the roof space and specify fire separation and roof covering accordingly. EIR-2069
  100. Make sure site fire plans for construction projects cover PV arrays, including isolation and firefighter access. EIR-2069
  101. Treat inverters and their loft wiring and connections as a credible ignition source on rooftop solar installations, and keep stored combustibles clear of that equipment. EIR-2076
  102. A fire service “most likely” finding made without a specialist investigation should be followed by a component-level examination before any firm conclusion is drawn. EIR-2076
  103. A fire starting at rooftop solar equipment can affect neighbouring homes, so installers should consider how a loft fire might spread to adjoining properties. EIR-2076
  104. Rooftop solar installations should be inspected for electrical faults, damaged cabling and connectors, particularly where a fire is suspected to have started in the array. EIR-2523
  105. Roof voids beneath solar arrays should be fitted with suitable detection so that a fire is spotted early. EIR-2523
  106. Householders and neighbours should know how to call emergency services quickly and how to isolate the system where it is safe to do so. EIR-2523
  107. Fire services should be told where PV systems are installed so that crews can plan for isolation and roof access. EIR-2523
  108. An electrical fault at the junction of two floating platforms can damage modules and cause sinking, so operators must inspect all platform joints and connections after any fault. EIR-0948
  109. A small fire from an electrical fault on a floating array requires immediate isolation and checks with the water utility before repairs start. EIR-0948
  110. Water quality tests after a fire on a reservoir array protect supply integrity, so the operator must coordinate with the utility at once. EIR-0948
  111. A solar panel fixed to a timber outbuilding may reflect sunlight onto nearby wood, so reflection onto combustible surfaces should be considered as well as electrical faults. EIR-2151
  112. Panels on sheds and other timber structures should be sited so that any reflected beam does not fall on dry timber or other combustible material. EIR-2151
  113. After a fire that has entered a roof space from an outbuilding, a later check for hidden hot spots is needed before the incident is treated as closed. EIR-2151
  114. Fire plans for buildings with rooftop solar should assume that panels may add structural load and collapse risk, and that roof access may be delayed until the array is made safe. EIR-2383
  115. Installers and owners should check that the roof structure can carry the panels and that the DC and AC wiring has been inspected after installation, particularly on newly fitted systems. EIR-2383
  116. Investigators should record the installation details of any PV system involved in a roof fire, so that the cause can be established and shared with the industry. EIR-2383
  117. Electric faults in rooftop solar panels can destroy wiring evidence when heat burns it away, so record early observations of the fire origin. EIR-1244
  118. Isolation and access plans for school rooftop arrays help crews limit a fire to one building section. EIR-1244
  119. Schools with rooftop solar need plans for continued teaching if a hall or roof fire closes the site. EIR-1244
  120. Ensure rapid isolation procedures for solar PV arrays during roof fires. EIR-1543
  121. Provide thermal imaging support early when solar panels are involved. EIR-1543
  122. Plan for additional breathing apparatus resources on properties with rooftop generation. EIR-1543
  123. An electrical fault in a roof-mounted solar inverter started a fire in the roof void, so operators should ensure inverters receive the same installation and maintenance standards as other household electrical equipment. EIR-1303
  124. Firefighters had to remove roof tiles to reach the fire in the roof void, so property owners should notify fire services of solar PV systems at domestic sites. EIR-1303
  125. Overheating in rooftop solar equipment can start a fire in a block of flats. EIR-1305
  126. Operators of solar on occupied buildings should be able to isolate the equipment and tell the fire service where it is. EIR-1305
  127. A headline attribution is not a confirmed failure mode and should be checked if an investigation is later published. EIR-1305
  128. Transformer buildings on solar farms need clear isolation points because live supply blocks entry and firefighting. EIR-1542
  129. Site staff must give isolation details to crews at once so defensive tactics can end quickly. EIR-1542
  130. Defensive stance with covering jets is required until power is confirmed off in energised plant rooms. EIR-1542
  131. Solar sites with pylons need a response plan that covers vegetation and electrical fire together. EIR-0172
  132. Grass and hedgerows beside electrical equipment should be managed to reduce ground fire risk to plant. EIR-0172
  133. Faulty solar panel wiring can start a loft fire, so installers must check all connections during commissioning and maintenance. EIR-1485
  134. A small solar wiring fire is quickly controlled by hose reel jets, so response plans should focus on early detection. EIR-1485
  135. Solar inverters on agricultural buildings should be identifiable and isolatable for attending crews. EIR-1548
  136. Fire logs for inverter fires should record damage and whether the array remained energised. EIR-1548
  137. Operators should treat a short official report as incomplete until damage and cause are known. EIR-1548
  138. Solar panel batteries stored in an attached garage can be damaged by fire, with smoke affecting the building, even after the property electrics have been isolated. EIR-1523
  139. A response to this type of fire may need breathing apparatus, thermal imaging and gas monitoring as well as hose jets. EIR-1523
  140. Where only a short official note is available, the ignition mechanism should not be assumed beyond the stated accidental cause. EIR-1523
  141. Isolate gas, electricity and the solar array under engineer guidance before crews work on a rooftop solar fire. EIR-1493
  142. Thermal imaging, an aerial platform and an extended hose can help crews reach and check a large roof fire. EIR-1493
  143. Record an accidental finding and share it so operators can review inspection of warehouse rooftop arrays. EIR-1493
  144. Fire crews may need a ready way to isolate photovoltaic equipment during suppression. EIR-1453
  145. Elevated access, such as a turntable ladder, may be needed where the equipment cannot be reached from the ground. EIR-1453
  146. A short local report does not establish how a fire started, so the method of response should not be treated as evidence of cause. EIR-1453
  147. Isolate solar PV systems at the earliest opportunity during firefighting. EIR-1521
  148. Ensure response crews have procedures for safely de-energising rooftop solar arrays. EIR-1521
  149. Treat a roof fire where a solar panel is involved as potentially live electrical equipment until it is isolated. EIR-1522
  150. Record whether the panel, cabling or isolator was damaged, not only that a panel was present in the fire. EIR-1522
  151. Keep the public clear while crews work at height with ladders and an aerial platform. EIR-1522
  152. Battery storage systems connected to solar panels require clear isolation points so first responders can cut supply without delay. EIR-1520
  153. After removal of a battery involved in fire, monitor its temperature with thermal imaging to confirm it has stabilised. EIR-1520
  154. A later reinspection after the initial response can detect any reignition risk in battery storage systems. EIR-1520
  155. Loose MC4 connectors on a solar PV array can cause arcing and fire, so operators should check all DC connections during routine inspections. EIR-1133
  156. Missing DC isolators on inverters force live cable cutting during replacement, so isolation equipment must be fitted before work starts. EIR-1133
  157. An uncommissioned replacement inverter leaves the array unmonitored, so full commissioning and monitoring must follow any swap. EIR-1133
  158. A roof fire involving solar panels may still be burning when crews arrive, so access at height and a check for remaining heat should be planned. EIR-1519
  159. Thermal imaging and a later reinspection can help find hotspots after the main fire is tackled. EIR-1519
  160. Involvement of panels is not, on its own, evidence that they caused the fire. EIR-1519
  161. Fire in one solar inverter can spread to the ground and to cabling of another inverter, so nearby cabling and ground cover should be treated as part of the incident. EIR-1517
  162. This electrical installation fire was put out with a carbon dioxide extinguisher, electrical gloves and thermal imaging. EIR-1517
  163. No cause was reported, so a similar event should be investigated before any design or maintenance change is assumed. EIR-1517
  164. Rooftop solar panel fires need electricians on site to remove damaged panels safely. EIR-0474
  165. Aerial ladder platforms give safe access to elevated solar arrays during fires. EIR-0474
  166. A reported fire in a solar panel can already be out when crews arrive, so a thermal imaging camera is a practical check for remaining heat. EIR-1547
  167. A small fire in a solar panel on a house should still be reported as a property fire rather than assumed to be finished. EIR-1547
  168. The first record may not identify the failed part, so follow-up should establish whether the panel, isolator or cabling was involved. EIR-1547
  169. Isolation switches on residential solar PV systems can overheat and start a roof fire, so inspection and maintenance should look for heat damage before failure. EIR-1546
  170. Homeowners should keep solar PV installations maintained in line with the installer's and manufacturer's guidance. EIR-1546
  171. When attending a roof fire, crews should be told if solar PV is present so they can isolate and work around it. EIR-1546
  172. Treat a headline-only solar fire report as unconfirmed until the fire service or a fuller account states what burned. EIR-1422
  173. Record place and date from the report, and leave cause, injuries and asset details blank until they are stated. EIR-1422
  174. Recheck live reports, because early pages often add no outcome. EIR-1422
  175. Rooftop solar fires on occupied buildings can need an aerial platform and extra crews, so access and water plans should be agreed before an incident. EIR-1526
  176. After the fire is out, hotspot monitoring and scheduled revisits reduce the risk of reignition. EIR-1526
  177. Incident logs should record which part of the array was involved so operators can check similar roofs. EIR-1526
  178. Review mounting and securing methods for rooftop solar arrays in areas prone to high winds. EIR-1502
  179. Inspect arrays promptly after severe weather and keep the public clear until the damage is understood. EIR-1502
  180. Plan temporary access and road controls where damaged panels may pose a risk to people nearby. EIR-1502
  181. Roof-mounted solar cabling should be inspected so electrical faults can be found before they ignite. EIR-1262
  182. A prompt fire service call-out and post-incident safety check support quick return to use. EIR-1262
  183. Suspected causes should be recorded as suspected until the investigation is complete. EIR-1262
  184. Inverters on rooftop solar arrays can ignite, so operators of commercial roofs should ensure inverters are installed, ventilated and maintained to the manufacturer's specification. EIR-2447
  185. Roof-level electrical equipment should have thermal monitoring or alarms so that a developing fault is detected before it becomes a visible fire. EIR-2447
  186. Store and site operators should plan closure and communication procedures for incidents involving rooftop electrical equipment so that customers and staff are informed quickly. EIR-2447
  187. Plan access and safe working positions for firefighters on the roofs of buildings under construction where solar panels are fitted and smoke may limit visibility. EIR-1545
  188. Treat fires involving solar panels as a hazard to emergency responders and brief crews before they work on the roof. EIR-1545
  189. Use a follow-up thermal scan to check for remaining hotspots before handing the scene back to the site owner. EIR-1545
  190. A suspected battery storage fault at a small site can destroy the unit, roof-mounted solar panels and a neighbouring structure before the cause is known. EIR-1514
  191. Treat an official belief about cause as provisional until an investigation is reported. EIR-1514
  192. Garage ranges with solar panels and storage need clear access for a multi-appliance fire service response. EIR-1514
  193. Incidents involving solar panels may need specialist equipment such as PV Stop to block sunlight and de-energise panels before crews approach. EIR-1512
  194. Water jets can conduct electricity from solar panels, so isolation procedures must be followed. EIR-1512
  195. Fire services should train for the specific risks of photovoltaic systems on roofs to limit spread and reduce shock hazards. EIR-1512
  196. A fire in a rooftop solar array can require evacuation of an occupied building even when crews contain it on the roof. EIR-1396
  197. An extinguishing method suited to the installation, here foam, and a later reinspection can help confirm that the fire has not restarted. EIR-1396
  198. Operators of hotels and similar buildings should keep a clear plan for moving guests away from a roof fire involving solar panels. EIR-1396
  199. Call the network operator early when electrical plant at a solar site is smoking. EIR-0764
  200. Give nearby residents clear advice when smoke may affect homes. EIR-0764
  201. Record whether the event was contained, and which equipment was involved, so an open attendance report is not left as the only account. EIR-0764
  202. Rooftop solar can remain live in daylight even when a fire has another believed cause, so crews need a way to reduce generation before working on the roof. EIR-1515
  203. Water applied near energised panels can conduct current along jets and hoses, so isolation or light-blocking should come before close-in work. EIR-1515
  204. Records should keep the believed ignition source separate from the presence of solar equipment, so a precautionary deployment is not later read as proof that the array failed. EIR-1515
  205. Home solar and battery work should include a clear way to isolate the batteries if a fault is suspected. EIR-1400
  206. On a site where the same equipment is fitted in several homes, isolation of the other units should be ready while the cause is checked. EIR-1400
  207. Reports of smoke exposure should be treated as a possible harm even when no injury is recorded at the scene. EIR-1400
  208. Ensure rapid isolation procedures for rooftop solar arrays during fire response. EIR-1527
  209. Maintain clear access for aerial appliances on buildings with roof-mounted solar. EIR-1527
  210. Coordinate with multiple agencies including police and local council during evacuations. EIR-1527
  211. Utility engineers should isolate electrical systems promptly when fire is reported. EIR-1528
  212. Early attendance by local fire services combined with on-site isolation reduces risk of escalation. EIR-1528
  213. Ensure electrical connections for rooftop solar installations are inspected and maintained to reduce the risk of faults. EIR-1530
  214. Working smoke alarms allow early detection and evacuation in properties with solar panels. EIR-1530
  215. Keeping internal doors closed can help contain fire and smoke to the room or area of origin. EIR-1530
  216. Rooftop solar on occupied blocks should have a clear isolation point that the electricity supplier or site manager can operate for attending crews. EIR-1529
  217. Evacuation planning for multi-storey homes with roof arrays should assume the fire may stay on the roof while residents still need to leave. EIR-1529
  218. After a contained panel fire, operators should confirm the array remains isolated until it has been inspected, rather than treating an extinguished fire as a return to service. EIR-1529
  219. Fire services need current site plans and isolation points for solar farm substations, including the isolators that separate the panel array from the substation. EIR-2206
  220. Operators should make trained technical staff or contact details available to emergency responders, so that expert guidance can be given quickly during an incident. EIR-2206
  221. Responders should isolate the array and confirm isolation at every point before close approach, since solar panels can remain live in daylight and the risk of electrocution persists. EIR-2206
  222. Distribution equipment linked to rooftop solar should be reachable for isolation and firefighting without relying on extensive removal of cladding. EIR-1272
  223. Occupied buildings should have a clear plan to evacuate and ventilate when smoke from electrical plant logs part of the building. EIR-1272
  224. Investigations into solar distribution-board fires should be shared so other operators can check similar equipment. EIR-1272
  225. Rooftop solar panels can start fires that spread to the structure below, so owners should inspect wiring and inverters before installation and at intervals. EIR-1273
  226. Smoke from a roof with solar panels allows early evacuation, so detectors should cover roof voids and alert before flames reach living areas. EIR-1273
  227. Fires involving rooftop solar need aerial access and electrical isolation plans, so response teams should train for height and live DC circuits. EIR-1273
  228. After severe weather, roof-mounted solar arrays should be checked for loose panels before they can fall or strike people below. EIR-1534
  229. Fire services may have to make renewable equipment safe during a storm when a contractor cannot attend quickly. EIR-1534
  230. A short official note may confirm that panels came loose and were secured, without stating cause, damage extent or whether anyone was hurt. EIR-1534
  231. A roof fire at a dwelling under construction can involve PV panels already fitted, so crews should treat the array as electrical equipment until it is isolated. EIR-1535
  232. Water used on a roof fire can damage more of a building than the fire itself, which matters where panels sit on the roof. EIR-1535
  233. Incident records should state whether solar PV was involved, and should not treat involvement as proof that the panels started the fire. EIR-1535
  234. Ensure battery connections are isolated when not actively monitored. EIR-1537
  235. Consider installing a smoke alarm or heat detector in a garage that houses energy storage equipment. EIR-1537
  236. On signs of fire, such as popping or banging, get everyone out and call the emergency services. EIR-1537
  237. Solar arrays on occupied school buildings should have clearly labelled isolation points so that fire crews can de-energise the DC circuits quickly. EIR-2522
  238. Operators should inspect DC cabling, connectors and inverters on a planned schedule, since electrical faults are a common ignition route for PV fires. EIR-2522
  239. Evacuation and fire plans for buildings with on-site generation should explicitly cover electrical fires in the solar system, and staff should be briefed on them. EIR-2522
  240. Log solar equipment as involved even when a fire is described as small, so later reviews can see patterns. EIR-1550
  241. A record of appliance numbers alone does not explain cause or damage, so operators should not treat it as a full investigation. EIR-1550
  242. Where panels are on a property, crews need a clear way to isolate the array before overhaul. EIR-1550
  243. A same-day belief that a solar panel started a loft fire should stay provisional until a fire investigation reports the cause. EIR-2065
  244. Owners of blocks with rooftop solar should know where cabling enters roof voids and how to isolate the system for the fire service. EIR-2065
  245. Periodic checks of solar connections near lofts can reduce the chance of a fault in a roof void. EIR-2065
  246. A solar battery that has recently been switched on should be checked for abnormal heat, smell or fault indications. EIR-1555
  247. Storage batteries in outbuildings should be kept clear of vehicles and other combustible items. EIR-1555
  248. Owners should have domestic solar batteries installed and maintained to recognised safety guidance. EIR-1555
  249. Coordinate at once with the distribution network operator and on-site maintenance staff so the electrical connection to an inverter can be isolated. EIR-1536
  250. Confirm isolation before treating the scene as safe. EIR-1536
  251. Do not infer a failure mode, damage or injuries from a short attendance notice that gives no further details. EIR-1536
  252. Homeowners should have rooftop solar systems inspected at regular intervals, including connectors, cabling and isolators. EIR-2085
  253. Fire services need to know that solar panels are present so crews can plan for parts that stay live in daylight. EIR-2085
  254. Reporting the cause of domestic solar fires, once found, helps installers and owners spot common faults. EIR-2085
  255. Roof-mounted solar arrays need fixings suited to local wind loads, and those fixings should be checked after high winds. EIR-1538
  256. Loose or fallen panels should be reported and the area kept clear until they are made safe. EIR-1538
  257. Crews should treat dislodged panels as a dangerous structure until the area is cordoned and the equipment is secured. EIR-1538
  258. An odour from rooftop solar heating plant should prompt full evacuation until the fire service confirms the building is safe. EIR-1238
  259. A chemical smell at a leisure centre with solar heating must be treated as a possible fluid leak until ruled out. EIR-1238
  260. Newly installed solar PV systems should be inspected for electrical faults and wiring defects during commissioning and before handover, particularly where the array sits on an occupied building. EIR-2526
  261. Operators of schools and other public buildings should have evacuation procedures that can be carried out quickly, so that a small fire can be contained without harm to occupants. EIR-2526
  262. Rooftop PV installations should be coordinated with the fire service so that crews know the array is present and can isolate the DC system safely during an incident. EIR-2526
  263. Roof-mounted solar panels on outbuildings can be involved in a property fire, so isolation and access should be planned before crews arrive. EIR-1551
  264. Fire logs often record only the panels involved and the appliances sent, so operators should not treat attendance figures as a measure of damage. EIR-1551
  265. Where a utility company is listed, confirm isolation with that company rather than assuming the array is safe. EIR-1551
  266. Isolate the photovoltaic supply before crews work in a roof space above a panel fire. EIR-1540
  267. Internal roof-space access may be needed when the array cannot be isolated from outside. EIR-1540
  268. An elevated platform may be needed to inspect a roof after a panel fire; a request is not the same as confirmed use. EIR-1540
  269. A roof fire involving solar panels should prompt early isolation of the array before close inspection. EIR-1553
  270. Aerial access may be needed where a rooftop array cannot be assessed safely from the ground. EIR-1553
  271. A short incident log may omit cause, damage and injuries, so isolation alone should not be treated as a full account of the outcome. EIR-1553
  272. A roof-mounted photovoltaic panel can detach and strike property below, so fixings should be suitable for the site. EIR-1539
  273. After strong winds, owners should check that panels and mounts remain secure. EIR-1539
  274. Crews attending a displaced panel need a way to isolate it and make it safe. EIR-1539
  275. A solar farm transformer housed in a container can be well alight before crews arrive, so isolation by the network operator and the solar contractor should be arranged at once. EIR-1541
  276. Where the unit is in a safe and isolated place, a controlled burn-down may be chosen, but crews should stay until the risk to people and neighbouring equipment has fallen. EIR-1541
  277. Handover to the contractor on site should be clear once power is isolated and the fire service is leaving. EIR-1541
  278. Liaise with on-site specialists to isolate electrical systems before attempting to extinguish fires at solar installations. EIR-1544

7. Worldwide context

391 incidents at grid-scale solar PV sites in 36 countries; 255 involved fire or overheating and 19 are classed as major.

YearWorldwideUK
202611517
20255917
20246111
20234613
20222910
2021176
2020126
2019183
2018144
201774
Earlier13
Stage of lifeIncidentsShare
Commissioning246%
Normal operation26969%
Maintenance21%
End-of-life10%
Not stated9524%

More recent years hold more entries partly because more is reported and found online. A rising count is not, by itself, a rising rate.

8. Kept apart: other battery entries in the UK (0)

Home, farm and business batteries, concerns raised where nothing failed, and events at battery sites that were not battery failures. NFCC's grid-scale guidance does not cover home batteries ("Domestic BESS are outside the scope of this guidance."), so they are listed here and not in the tables above.

None.

9. Using this pack

Paragraphs you can paste into a planning statement or a consultee response. They are neutral, use only figures from this pack, and each carries its citation. Please keep the citation with the text.

Incidents in the UK

The Energy Incident Register, a public record built from published reporting, lists 96 incidents at grid-scale solar PV sites in the UK as of 29 October 2026, 4 of them classed as major. The nearest to the site is EIR-1303 (Solar panel inverter fault destroys two Lewes homes), about 50 km away in a straight line.

Source: Energy Incident Register, planning evidence pack EIR-PACK-D-KENT-MEDWAY-ADOLESCENT-HOSPITAL-GROUND-M, section 2, data as of 29 October 2026. Entry EIR-1303: https://energyincidentregister.com/incident/eir-1303/

Planning decisions nearby

The Renewable Energy Planning Database records 29 solar PV sites within 40 km of the site where an application was refused, withdrawn or taken to appeal. Their final outcomes are: 9 refused, 7 refused on appeal, 2 withdrawn, 1 appeal withdrawn, 7 granted on appeal, 3 granted. The nearest refused scheme is Land At Pullen Farm (Tunbridge Wells, application 15/503884/FULL), about 2.4 km from the site.

Source: Department for Energy Security and Net Zero, Renewable Energy Planning Database (Open Government Licence v3.0), as grouped by site in Energy Incident Register planning evidence pack EIR-PACK-D-KENT-MEDWAY-ADOLESCENT-HOSPITAL-GROUND-M, section 3, data as of 29 October 2026.

Worldwide context

Worldwide, the Energy Incident Register lists 391 incidents at grid-scale solar PV sites in 36 countries as of 29 October 2026. Of these, 255 involved fire or overheating and 19 are classed as major. The register counts published reports of incidents; the figures are not failure rates.

Source: Energy Incident Register, planning evidence pack EIR-PACK-D-KENT-MEDWAY-ADOLESCENT-HOSPITAL-GROUND-M, section 7, data as of 29 October 2026.

Sites of a similar size

The register lists 2 grid-scale incidents worldwide at sites between 0.1 and 0.4 MW, where the reporting gives the capacity.

Source: Energy Incident Register, planning evidence pack EIR-PACK-D-KENT-MEDWAY-ADOLESCENT-HOSPITAL-GROUND-M, section 5, data as of 29 October 2026.

10. How this pack was made and checked

  1. The register is built from published reporting: news, fire service statements, regulators and court records. Each entry lists its sources on its own page. Entries marked provisional rest on thinner sourcing and are rechecked.
  2. Grid-scale or not: an entry is grid-scale unless its reporting describes a home, farm or business battery, or an event that was not a battery failure. The rule is the same for every pack.
  3. Distances are measured from the site point (the planning record for Kent Medway Adolescent Hospital - Ground Mounted Solar Panels) to each entry's map point, which is a town or a site, never an address.
  4. Planning decisions come from the government's Renewable Energy Planning Database (Open Government Licence v3.0), with corrections where a council's own record shows a later decision.
  5. Desk review. The EIR editorial desk checks each bought pack within 2 working days (Monday to Friday) of the order:
    1. The site point and planning authority match the planning record, or the details the buyer gave.
    2. Each UK incident is a separate event, not one fire written twice, and sits in the right table: grid-scale sites in the main table, home, farm and business batteries apart.
    3. Each UK grid-scale incident has a note, and every quoted passage matches the NFCC text at the link given.
    4. The three nearest planning decisions match the council's own planning record.
    5. The distances to the nearest incidents look right on a map.
    6. Nothing in the pack comes from a confidential submission or names a private person.
  6. If anything needs changing, the desk makes a new version and emails the link. Every version is fixed and dated, and earlier versions stay available at the same link. The method is at energyincidentregister.com/pack-method.
  7. Information only. It is not engineering, fire safety or legal advice. See the disclaimer.

How to cite: Energy Incident Register, planning evidence pack EIR-PACK-D-KENT-MEDWAY-ADOLESCENT-HOSPITAL-GROUND-M, data as of 29 October 2026, energyincidentregister.com.

A correction to any entry is free for anyone: corrections. Questions about this pack: editor@energyincidentregister.com.