Lightning strike damages distribution panel at Mabaruma Solar Farm, Guyana
2019Published 17 Sept 2026Responsible editor: Chief Editor
- Where
- Mabaruma Solar Farm, Khan's Hill, Mabaruma, Guyana
- Operator
- Hinterland Electrification
- Owner
- Ministry of Public Infrastructure
- What
- Lightning damaged distribution panel before commissioning
- Outcome
- Contract terminated and equipment replaced by new tender
Get the next one by email
Free alerts on solar PV incidents worldwide, and an email when EIR-0982 is updated. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Hinterland Electrification, Meeco, Ministry of Public Infrastructure
What happened
The 400kW Mabaruma Solar Farm at Khan's Hill, Mabaruma, Guyana, operated by Hinterland Electrification and owned by the Ministry of Public Infrastructure, was struck by lightning before completion of commissioning, damaging a distribution panel that carried electricity from the solar farm to the power house. An engineer inspecting the site found that the plant had not been properly earthed, meaning a repeat lightning strike could cause further damage. The Government Electrical Inspectorate later tested the grounding of the lightning protection systems and found they did not meet specifications.
The EPC contractor, Meeco, and Hinterland Electrification disputed responsibility for rectifying the fault, delaying commissioning beyond its original 2018 target. The contract was eventually terminated and the transformer and other damaged equipment were scheduled for replacement through a new tender process.
Contributing factors
Inadequate earthing and lightning protection at the solar farm, which failed to meet required specifications; a contractual dispute between Meeco and Hinterland Electrification over responsibility for remedial works delayed repairs.
Lessons learned
- Lightning protection and earthing at solar farms must be tested to meet specifications before energisation, or a strike may damage the distribution panel.
- Grounding systems at solar sites should pass independent electrical inspectorate checks before commissioning to avoid later replacement.
- Contracts for solar projects must assign clear responsibility for earthing performance to prevent disputes that delay repairs.
More lessons on weather and external hazards, electrical protection and isolation, from every incident on the register.
Not yet known
- Turbine model and age
- Cost of the damage
- Length of commissioning delay
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Published 2026-09-17. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.