Grid infrastructureGuyanaEIR-0396

Explosion at Good Hope substation triggers widespread power outages in Guyana

Dec 2025Published 7 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
supply cut for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Good Hope Substation, East Coast of Demerara, Guyana
Operator
Guyana Power and Light Inc. (GPL)
What
Explosion in switchgear room took substation offline
Cause
Smoke from main breaker panel
Outcome
Most power restored within an hour

Companies named in the reporting of this entry (being named is not a finding of fault): Guyana Power

Shortly after midday, a loud explosion was heard at the Good Hope Substation on the East Coast of Demerara, operated by Guyana Power and Light Inc. (GPL). The substation, a key interconnection point between the Demerara and Berbice systems, went offline immediately after the blast. Investigations found smoke coming from the main breaker panel in the switchgear room. The sudden loss of the substation destabilised the national grid, causing multiple feeders to trip.

GPL began incremental restoration efforts and restored power to most affected areas within about an hour, though customers along the East Coast Demerara corridor from Success to Hope remained without electricity at the time of reporting. A mobile substation was deployed to Good Hope as a temporary measure while engineers assessed the damage and planned repairs.

GPL stated the explosion and smoke originated from the main breaker panel in the substation switchgear room. Commentators cited in the report noted that the transmission and distribution system remains prone to disturbances despite past investment, though this is a general observation rather than a confirmed technical cause.

  1. A substation that links two grid regions needs backup paths or fast transfer schemes, because loss of the main breaker panel removed supply from both Demerara and Berbice systems.
  2. Mobile substations should be kept ready for critical sites, because the unit deployed at Good Hope allowed most customers to be restored within an hour.
  3. Switchgear rooms at interconnection substations require targeted inspection of breaker panels, because the explosion and smoke started in the main breaker panel.

More lessons on electrical protection and isolation, outages, backup supply and restoration, from every incident on the register.

  • Root cause of the breaker panel failure
  • Model and age of the failed equipment
  • Time until full restoration on East Coast corridor
  • Cost of repairs and mobile substation use

This entry is updated when these are reported. Get an alert for the next one like it.

Published 2026-09-07. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Grid infrastructure incidents by year, free with a credit (PNG).

Substation and transformer fires: the counts, the latest entries and a free alert for the next one. Also: switchgear and breaker fires.

Browse the full register or submit an incident.