Six workers killed as tower collapses at Avada solar plant in Nagpur
2025Published 7 Sept 2026Responsible editor: Chief Editor
- Where
- Avada solar plant, Butibori industrial area near Nagpur, Maharashtra
- What
- Tower structure collapsed
- Injuries
- Six workers killed
- Response
- Local police attended scene and launched investigation; rescue operations carried out
- Cause
- Under investigation
Get the next one by email
Free alerts on solar PV incidents in India, and an email when EIR-0398 is updated. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Avada
What happened
A tower structure collapsed at the Avada solar plant in the Butibori industrial area near Nagpur, Maharashtra, resulting in the deaths of six workers. Local police attended the scene and launched an investigation into the cause of the collapse. Rescue operations were carried out to recover those affected. Video footage of the aftermath circulated in local media reporting. Details of the exact structure involved, whether it was a transmission tower, mounting structure or other installation, were not specified in initial reporting. The stage of construction or commissioning at the time of the collapse was also not confirmed in the source material.
Contributing factors
Not reported.
Lessons learned
- Tower structures at solar plants can collapse during erection, so operators must verify load capacity and stability before workers enter the area.
- When the exact type of tower or mounting frame is unclear, sites should apply exclusion zones around all tall structures until design checks are complete.
More lessons on structural integrity and turbines, from every incident on the register.
Not yet known
- Exact structure involved
- Stage of construction or commissioning
- Contributing factors
This entry is updated when these are reported. Get an alert for the next one like it.
Source
Published 2026-09-07. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.