Solar PVIndia2019

Storm reported to have damaged panels at Bhadla Solar Park in Rajasthan, India

EIR-1004

Provisional entry. Confirmed: a severe storm on 17 April 2019 with site wind speeds reported up to 130 km/h damaged solar panels at Bhadla Solar Park; not yet known are the number of panels affected, which developers' plants were hit, the financial loss and any confirmed root cause. Next update: 19 September 2026.

On 17 April 2019 a severe storm, with wind speeds reported as high as 130 km/h recorded at the site, struck Bhadla Solar Park in Bhadla, Jodhpur district, Rajasthan. The park is one of the largest solar parks in India, with an existing installed capacity of over 1500 MW across about 10,000 acres and a planned capacity of 2255 MW. Trade reporting says the storm damaged a large number of solar panels, although the extent of the damage was not confirmed by the developers at the time of publication. The park hosts several developers including ACME, SB Energy, Azure Power, Adani Energy and ReNew Power. The same storm caused widespread damage across several Indian states, with over 50 fatalities reported in the wider area, and also affected a solar powered railway station in Udaipur. Casualties or injuries at the solar park were not reported either way. Developers were reported to be assessing damage and repair requirements.

High wind speeds during the storm. An EPC contractor speaking anonymously to the publication said that design and specifications for the area already provided for sandstorms and extreme heat, but that factors such as undulating terrain or small construction errors could be greatly exaggerated at the wind speeds experienced. No root cause has been confirmed.

  1. Solar installations in storm-prone regions benefit from design and verification against extreme wind loads, not only typical regional conditions.
  2. Terrain variability, such as undulating ground, should be reflected in mounting structure design and in construction quality assurance.
  3. Rapid post-storm inspection and damage assessment procedures help operators quantify losses and prioritise repairs across large multi-developer sites.
  4. Insurance and weather risk arrangements should be reviewed for large parks exposed to seasonal extreme weather.

Published 2026-09-17. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

Get the next one like this

One email when a newly reported incident is confirmed, at most two a day, plus a Monday digest. Free, no account needed, unsubscribe in one click.

By subscribing you agree to the privacy policy.

Related incidents

Solar PV incidents in India: 5 entries, with a free alert for the next one.

Browse the full register or submit an incident.