← Back to Kent
Planning pack for this site, £295Other options

Solar · United Kingdom

Vigo Lane, Borden - Solar Farm

Operator Industria Solar Vigo (Industria Brand Energy)

Awaiting Construction40 MWData checked 16 November 2026Source record dated 16 September 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Vigo Lane, Borden - Solar Farm is a 40 MW solar farm 3.9 km south-west of Sittingbourne, Kent, United Kingdom. Its planning application (23/502210/FULL) went to Swale on 5 May 2023 and was granted on appeal on 1 September 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 37 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Vigo Lane, Borden - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 34 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house34 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers36 kmMinor
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
40 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Industria Solar Vigo (Industria Brand Energy)
Location
Vigo Lane Borden, Kent, ME9 8BE, United Kingdom
Planning authority
Swale
Planning application
23/502210/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/502210/FULL, with what the planning evidence pack adds for this site.

Every application in Swale · Alerts for applications and incidents near here

  • 5 May 2023 Planning application submitted
  • 9 August 2024 Planning permission refused
  • 1 September 2025 Planning permission granted
  • 1 September 2025 Appeal granted

None found. The register holds no published incident that names Vigo Lane, Borden - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Vigo Lane, Borden - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Vigo Lane, Borden - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Vigo Lane, Borden - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 September 2025.
Where is Vigo Lane, Borden - Solar Farm?
3.9 km south-west of Sittingbourne, Kent, United Kingdom (postcode ME9 8BE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).