Solar · United Kingdom
North Court Farm, Chilham - Solar Farm
Operator GSI North Court Limited
Appeal Refused44 MWData checked 16 November 2026Source record dated 3 May 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
North Court Farm, Chilham - Solar Farm is a 44 MW solar farm 7.8 km west of Canterbury, Kent, United Kingdom. Its planning application (PA/2022/2415) went to Ashford on 25 October 2022 and was refused by the Secretary of State on 31 October 2025. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 35 other energy sites within 10 km, 27 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when North Court Farm, Chilham - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 44 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Refused
- Operator or applicant
- GSI North Court Limited
- Location
- North Court Farm, Lower Lees Road, Chilham, Canterbury, Kent, CT4 8AU, United Kingdom
- Planning authority
- Ashford
- Planning application
- PA/2022/2415
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for PA/2022/2415, with what the planning evidence pack adds for this site.
Every application in Ashford · Alerts for applications and incidents near here
Timeline
- 25 October 2022 Planning application submitted
- 18 April 2024 Planning permission refused
- 31 October 2025 Refused by the Secretary of State
- 31 October 2025 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names North Court Farm, Chilham - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has North Court Farm, Chilham - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names North Court Farm, Chilham - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of North Court Farm, Chilham - Solar Farm?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2024.
- Where is North Court Farm, Chilham - Solar Farm?
- 7.8 km west of Canterbury, Kent, United Kingdom (postcode CT4 8AU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).