Solar · United Kingdom
Great Tong Solar Farm
Operator Solar Securities
Appeal Withdrawn4.9 MWData checked 16 November 2026Source record dated 30 August 2018
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Great Tong Solar Farm is a 4.9 MW solar farm 5.7 km north-east of Staplehurst, Kent, United Kingdom. Its planning application (15/505974/FULL) went to Maidstone on 24 August 2015 and was refused on 29 February 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal withdrawn. There are 16 other energy sites within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Great Tong Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 4.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Appeal Withdrawn
- Operator or applicant
- Solar Securities
- Location
- Great Tong Farm, Great Tong, Headcorn, Ashford, Kent, TN27 9PP, United Kingdom
- Planning authority
- Maidstone
- Planning application
- 15/505974/FULL
- Appeal reference
- APP/U2235/W/16/3157476
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/505974/FULL, with what the planning evidence pack adds for this site.
Every application in Maidstone · Alerts for applications and incidents near here
Timeline
- 24 August 2015 Planning application submitted
- 29 February 2016 Planning permission refused
- 21 December 2016 Appeal lodged
- 10 January 2017 Appeal withdrawn
Incidents on the register at this site
None found. The register holds no published incident that names Great Tong Solar Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Great Tong Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Great Tong Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Great Tong Solar Farm?
- Appeal Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 30 August 2018.
- Where is Great Tong Solar Farm?
- 5.7 km north-east of Staplehurst, Kent, United Kingdom (postcode TN27 9PP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).