Solar · United Kingdom
Tuckey Farm
Operator Solar Securities
Revised2.5 MWData checked 16 November 2026Source record dated 2 December 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Tuckey Farm is a 2.5 MW solar farm 9.2 km south-east of Buckingham, United Kingdom. Its planning application (15/02543/APP) went to Buckinghamshire on 21 August 2015 and was granted on 11 December 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 35 other energy sites within 10 km, 21 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Tuckey Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Tuckey Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1519, Solar panels involved in outbuilding roof fire in Bourne End, 41 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1519 | 2025 | Solar panels involved in outbuilding roof fire in Bourne End | 41 km | Minor |
| EIR-1493 | 2026 | Solar panels catch fire on Bedford warehouse roof | 41 km | Minor |
| EIR-1448 | 2026 | Roof fire at new-build house with solar panels in Wellingborough | 43 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 2.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Solar Securities
- Location
- East Claydon Road Winslow, East Claydon Road, Winslow, Buckinghamshire, MK18 3ND, United Kingdom
- Planning authority
- Buckinghamshire
- Planning application
- 15/02543/APP
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/02543/APP, with what the planning evidence pack adds for this site.
Every application in Buckinghamshire · Alerts for applications and incidents near here
Timeline
- 21 August 2015 Planning application submitted
- 11 December 2015 Planning permission granted
- 11 December 2018 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Tuckey Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Tuckey Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Tuckey Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Tuckey Farm?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2019.
- Where is Tuckey Farm?
- 9.2 km south-east of Buckingham, United Kingdom (postcode MK18 3ND).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).