← Back to Kent

Solar · United Kingdom

Kent Medway Adolescent Hospital - Ground Mounted Solar Panels

Operator Kent and Medway Adolescent Unit

Application Refused0.2 MWData checked 16 November 2026Source record dated 1 April 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Kent Medway Adolescent Hospital - Ground Mounted Solar Panels is a 0.2 MW solar farm in Staplehurst, Kent, United Kingdom. Its planning application (24/503785/FULL) went to Maidstone on 13 September 2024 and was refused on 12 March 2025. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 23 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

370 energy sites within 40 km for Kent Medway Adolescent Hospital - Ground Mounted Solar…

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Kent and Medway Adolescent Unit
Location
Woodland House, Winthrop Hall, Cranbrook Road, Staplehurst, Tonbridge, Kent, TN12 0ER, United Kingdom
Planning authority
Maidstone
Planning application
24/503785/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 24/503785/FULL, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 13 September 2024 Planning application submitted
  • 12 March 2025 Planning permission refused

None found. The register holds no published incident that names Kent Medway Adolescent Hospital - Ground Mounted Solar Panels. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Kent Medway Adolescent Hospital - Ground Mounted Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kent Medway Adolescent Hospital - Ground Mounted Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kent Medway Adolescent Hospital - Ground Mounted Solar Panels?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
Where is Kent Medway Adolescent Hospital - Ground Mounted Solar Panels?
In Staplehurst, Kent, United Kingdom (postcode TN12 0ER).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).