← Back to Kent

Solar · United Kingdom

Widehurst Farm

Operator Wirsol (formerly Susenco)

Operational5 MWData checked 16 November 2026Source record dated 18 July 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Widehurst Farm is a 5 MW solar farm 3 km west of Staplehurst, Kent, United Kingdom. Its planning application (15/505971/FULL) went to Maidstone on 1 October 2015 and was granted on 3 March 2016. It has been operating since 15 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

395 energy sites within 40 km for Widehurst Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Wirsol (formerly Susenco)
Location
Land At Widehurst Farm, Thorn Road, Marden, Tonbridge, Kent, TN12 9LN, United Kingdom
Planning authority
Maidstone
Planning application
15/505971/FULL
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/505971/FULL, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 1 October 2015 Planning application submitted
  • 3 March 2016 Planning permission granted
  • 7 November 2016 Construction started
  • 15 March 2017 Operational

None found. The register holds no published incident that names Widehurst Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Widehurst Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Widehurst Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Widehurst Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 July 2017.
Where is Widehurst Farm?
3 km west of Staplehurst, Kent, United Kingdom (postcode TN12 9LN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).