Solar · United Kingdom

Eckley Farms, Marden - Solar Energy Farm

Operator Statkraft Wind UK Limited · Owner Wind UK Invest Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 13 February 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Eckley Farms, Marden - Solar Energy Farm is a 49.9 MW solar farm 5.9 km east of Paddock Wood, Kent, United Kingdom. Its planning application (22/501335/FULL) went to Maidstone on 1 June 2022 and was granted on appeal on 5 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 35 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

STATKRAFT WIND UK LIMITED (04831330), active, since 2003. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Eckley Farms, Marden - Solar Energy Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1173, Rooftop solar panel fire on residential block in Lewisham, London, 46 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London46 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel47 kmSignificant
EIR-13032017Solar panel inverter fault destroys two Lewes homes47 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Statkraft Wind UK Limited
Owner
Wind UK Invest Limited
Location
N/O Little Cheveney Farm, Sheephurst Lane, Marden, Kent, TN12, United Kingdom
Planning authority
Maidstone
Planning application
22/501335/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 22/501335/FULL, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 1 June 2022 Planning application submitted
  • 28 October 2022 Planning permission refused
  • 5 February 2024 Planning permission granted
  • 5 February 2024 Appeal granted

None found. The register holds no published incident that names Eckley Farms, Marden - Solar Energy Farm. If you know of one, report it (confidential reports are anonymised).

Has Eckley Farms, Marden - Solar Energy Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Eckley Farms, Marden - Solar Energy Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Eckley Farms, Marden - Solar Energy Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 February 2024.
Where is Eckley Farms, Marden - Solar Energy Farm?
5.9 km east of Paddock Wood, Kent, United Kingdom (postcode TN12).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).