Solar · United Kingdom

Berry Gardens, Redwall Lane - Solar Panels

Operator Beba Energy Limited

Awaiting Construction0.6 MWData checked 16 November 2026Source record dated 8 September 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Berry Gardens, Redwall Lane - Solar Panels is a 0.6 MW solar farm 6.2 km south of Maidstone, Kent, United Kingdom. Its planning application (23/502844/FULL) went to Maidstone on 6 July 2023 and was granted on 31 August 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 29 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Berry Gardens, Redwall Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1530, Electrical fault causes solar panel fire in Wickford house, 44 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15302023Electrical fault causes solar panel fire in Wickford house44 kmMinor
EIR-11732024Rooftop solar panel fire on residential block in Lewisham, London45 kmSignificant
EIR-13052017Fire at Thornton Heath flats reported to have been caused by an overheated solar panel46 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Beba Energy Limited
Location
Berry Gardens, Wares Farm, Redwall Lane, Linton, Maidstone, Kent, ME17 4BA, United Kingdom
Planning authority
Maidstone
Planning application
23/502844/FULL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/502844/FULL, with what the planning evidence pack adds for this site.

Every application in Maidstone · Alerts for applications and incidents near here

  • 6 July 2023 Planning application submitted
  • 31 August 2023 Planning permission granted
  • 31 August 2026 Planning permission expired

None found. The register holds no published incident that names Berry Gardens, Redwall Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Berry Gardens, Redwall Lane - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Berry Gardens, Redwall Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Berry Gardens, Redwall Lane - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 September 2023.
Where is Berry Gardens, Redwall Lane - Solar Panels?
6.2 km south of Maidstone, Kent, United Kingdom (postcode ME17 4BA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).