Solar · United Kingdom
Capel Grange Solar Park
Operator West Coast Energy
Operational6.6 MWData checked 16 November 2026Source record dated 20 June 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Capel Grange Solar Park is a 6.6 MW solar farm on the edge of Paddock Wood, Kent, United Kingdom. Its planning application (14/506168/FULL) went to Tunbridge Wells on 12 December 2014 and was granted on 10 April 2015. It has been operating since 31 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 26 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Capel Grange Solar Park changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 6.6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- West Coast Energy
- Location
- OS Plot 8200, Badsell Road, Five Oak Green, Tonbridge, Kent, United Kingdom
- Planning authority
- Tunbridge Wells
- Planning application
- 14/506168/FULL
- First operating
- 2016
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/506168/FULL, with what the planning evidence pack adds for this site.
Every application in Tunbridge Wells · Alerts for applications and incidents near here
Timeline
- 12 December 2014 Planning application submitted
- 10 April 2015 Planning permission granted
- 1 November 2015 Construction started
- 31 March 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Capel Grange Solar Park. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Capel Grange Solar Park had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Capel Grange Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Capel Grange Solar Park?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 20 June 2016.
- Where is Capel Grange Solar Park?
- On the edge of Paddock Wood, Kent, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).