Solar · United Kingdom
Worsted Farm
Operator S4N Worsted/
Operational5 MWData checked 16 November 2026Source record dated 18 April 2019
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Worsted Farm is a 5 MW solar farm on the edge of East Grinstead, West Sussex, United Kingdom. Its planning application (DM/15/3056) went to Mid Sussex on 15 September 2015 and was granted on appeal on 21 November 2016. It has been operating since 16 April 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Worsted Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- S4N Worsted/
- Location
- Land At Worsted Farm, Worsted Lane, East Grinstead, West Sussex, West Sussex, RH19 3UF, United Kingdom
- Planning authority
- Mid Sussex
- Planning application
- DM/15/3056
- Appeal reference
- APP/D3830/W/16/3151730
- First operating
- 2019
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DM/15/3056, with what the planning evidence pack adds for this site.
Every application in Mid Sussex · Alerts for applications and incidents near here
Timeline
- 15 September 2015 Planning application submitted
- 24 December 2015 Planning permission refused
- 27 June 2016 Appeal lodged
- 21 November 2016 Planning permission granted
- 21 November 2016 Appeal granted
- 1 January 2019 Construction started
- 16 April 2019 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Worsted Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Worsted Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Worsted Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Worsted Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2019.
- Where is Worsted Farm?
- On the edge of East Grinstead, West Sussex, United Kingdom (postcode RH19 3UF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).