← Back to West Sussex

Solar · United Kingdom

Worsted Farm

Operator S4N Worsted/

Operational5 MWData checked 16 November 2026Source record dated 18 April 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Worsted Farm is a 5 MW solar farm on the edge of East Grinstead, West Sussex, United Kingdom. Its planning application (DM/15/3056) went to Mid Sussex on 15 September 2015 and was granted on appeal on 21 November 2016. It has been operating since 16 April 2019. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

381 energy sites within 40 km for Worsted Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
S4N Worsted/
Location
Land At Worsted Farm, Worsted Lane, East Grinstead, West Sussex, West Sussex, RH19 3UF, United Kingdom
Planning authority
Mid Sussex
Planning application
DM/15/3056
Appeal reference
APP/D3830/W/16/3151730
First operating
2019

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/15/3056, with what the planning evidence pack adds for this site.

Every application in Mid Sussex · Alerts for applications and incidents near here

  • 15 September 2015 Planning application submitted
  • 24 December 2015 Planning permission refused
  • 27 June 2016 Appeal lodged
  • 21 November 2016 Planning permission granted
  • 21 November 2016 Appeal granted
  • 1 January 2019 Construction started
  • 16 April 2019 Operational

None found. The register holds no published incident that names Worsted Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Worsted Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Worsted Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Worsted Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 18 April 2019.
Where is Worsted Farm?
On the edge of East Grinstead, West Sussex, United Kingdom (postcode RH19 3UF).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).