Solar · United Kingdom
Barrow Green Farm
Operator Barrow Green Solar Park
Revised15 MWData checked 16 November 2026Source record dated 4 April 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Barrow Green Farm is a 15 MW solar farm 4.6 km west of Edenbridge, Surrey, United Kingdom. Its planning application (2014/1014) went to Tandridge on 18 July 2014 and was refused on appeal on 30 March 2016. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 18 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Barrow Green Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Barrow Green Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2447, Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton, 23 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-2447 | 2024 | Inverter fire on rooftop solar equipment at Sainsbury's store in Sutton | 23 km | Minor |
| EIR-1512 | 2024 | Solar panels involved in fire at school in Carshalton | 24 km | Minor |
| EIR-1305 | 2017 | Fire at Thornton Heath flats reported to have been caused by an overheated solar panel | 25 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 15 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Revised
- Operator or applicant
- Barrow Green Solar Park
- Location
- Land at Barrow Green Farm, Haxted Road, Lingfield, Surrey, RH7 6DE, United Kingdom
- Planning authority
- Tandridge
- Planning application
- 2014/1014
- Appeal reference
- APP/M3645/W/15/3133066
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2014/1014, with what the planning evidence pack adds for this site.
Every application in Tandridge · Alerts for applications and incidents near here
Timeline
- 18 July 2014 Planning application submitted
- 24 October 2014 Planning permission refused
- 17 September 2015 Appeal lodged
- 30 March 2016 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Barrow Green Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Barrow Green Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Barrow Green Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Barrow Green Farm?
- Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 4 April 2016.
- Where is Barrow Green Farm?
- 4.6 km west of Edenbridge, Surrey, United Kingdom (postcode RH7 6DE).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).