Land at Barrow Green Farm

Operator Dowsett Mayhew Planning Partnership

Application Refused5 MWData checked 16 November 2026Source record dated 7 April 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Barrow Green Farm is a 5 MW solar farm 4.6 km west of Edenbridge, Surrey, United Kingdom. Its planning application (2015/57) went to Tandridge on 13 January 2015 and was refused on 25 February 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 18 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

551 energy sites within 40 km for Land at Barrow Green Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Dowsett Mayhew Planning Partnership
Location
Land at Barrow Green Farm, Haxted Road, Lingfield, Surrey, RH7 6DE, United Kingdom
Planning authority
Tandridge
Planning application
2015/57

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2015/57, with what the planning evidence pack adds for this site.

Every application in Tandridge · Alerts for applications and incidents near here

  • 13 January 2015 Planning application submitted
  • 25 February 2015 Planning permission refused

None found. The register holds no published incident that names Land at Barrow Green Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Barrow Green Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Barrow Green Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Barrow Green Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 7 April 2015.
Where is Land at Barrow Green Farm?
4.6 km west of Edenbridge, Surrey, United Kingdom (postcode RH7 6DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).