← Back to Kent

Solar · United Kingdom

Partridge Farm

Operator Eco Energy World

Operational10.6 MWData checked 16 November 2026Source record dated 14 April 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Partridge Farm is a 10.6 MW solar farm 8.3 km north-west of Hythe, Kent, United Kingdom. Its planning application (14/00398/AS) went to Ashford on 28 April 2014 and was granted on appeal on 6 October 2015. It has been operating since 24 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 18 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 269 energy sites within 40 km for Partridge Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Eco Energy World
Location
Land south of National Grid Converter Station, Church Lane, Aldington, Kent, Kent, United Kingdom
Planning authority
Ashford
Planning application
14/00398/AS
Appeal reference
APP/E2205/W/15/3003125
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00398/AS, with what the planning evidence pack adds for this site.

Every application in Ashford · Alerts for applications and incidents near here

  • 28 April 2014 Planning application submitted
  • 22 July 2014 Planning permission refused
  • 18 February 2015 Appeal lodged
  • 6 October 2015 Planning permission granted
  • 6 October 2015 Appeal granted
  • 7 December 2015 Construction started
  • 24 March 2016 Operational

None found. The register holds no published incident that names Partridge Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Partridge Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Partridge Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Partridge Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 April 2016.
Where is Partridge Farm?
8.3 km north-west of Hythe, Kent, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).