← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Ashford

Partridge Farm

Operational10.6 MWApplication 14/00398/ASSubmitted 28 April 2014Granted on appeal 6 October 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
14/00398/AS
Planning authority
Ashford
County or area
Kent
Nation
England
Technology
Solar
Capacity
10.6 MW
Status
Operational
Operator or applicant
Eco Energy World
Location
Land south of National Grid Converter Station, Church Lane, Aldington, Kent
Appeal reference
APP/E2205/W/15/3003125
First operating
2016
  • 28 April 2014 Planning application submitted
  • 22 July 2014 Planning permission refused
  • 18 February 2015 Appeal lodged
  • 6 October 2015 Planning permission granted
  • 6 October 2015 Appeal granted
  • 7 December 2015 Construction started
  • 24 March 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-2069, Solar panel fire spreads through roof of new flats at Ebbsfleet, 35 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-20692021Solar panel fire spreads through roof of new flats at Ebbsfleet35 kmSignificant
EIR-15302023Electrical fault causes solar panel fire in Wickford house65 kmMinor
EIR-15372021Garage fire from overheated solar batteries in South Woodham Ferrers65 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Partridge Farm is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Ashford.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.