Solar · United Kingdom

Stonestreet Green - Solar Farm & Battery Storage

Operator Evolution Power

Awaiting Construction99.9 MWData checked 16 November 2026Source record dated 11 November 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stonestreet Green - Solar Farm & Battery Storage is a 99.9 MW solar farm 6.7 km south-east of Ashford, Kent, United Kingdom. Its planning application (EN010135) went to The Planning Inspectorate - National Infrastructure on 9 July 2024 and was granted on 23 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 36 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

EVOLUTION POWER LIMITED (13544817), active, since 2021. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Stonestreet Green - Solar Farm & Battery Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0109, Fire in single battery unit at Thurrock BESS under construction, 56 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-01092025Fire in single battery unit at Thurrock BESS under construction56 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire210 kmSignificant
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells265 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
99.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Evolution Power
Location
Stonestreet Green, Aldington, Ashford, Kent, TN25 7DE, United Kingdom
Planning authority
The Planning Inspectorate - National Infrastructure
Planning application
EN010135

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for EN010135, with what the planning evidence pack adds for this site.

Every application in The Planning Inspectorate - National Infrastructure · Alerts for applications and incidents near here

  • 9 July 2024 Planning application submitted
  • 23 October 2025 Planning permission granted
  • 23 October 2028 Planning permission runs out

None found. The register holds no published incident that names Stonestreet Green - Solar Farm & Battery Storage. If you know of one, report it (confidential reports are anonymised).

Has Stonestreet Green - Solar Farm & Battery Storage had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stonestreet Green - Solar Farm & Battery Storage; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Stonestreet Green - Solar Farm & Battery Storage?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 11 November 2025.
Where is Stonestreet Green - Solar Farm & Battery Storage?
6.7 km south-east of Ashford, Kent, United Kingdom (postcode TN25 7DE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).