← Back to Kent

Solar · United Kingdom

Oaklands Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational6.9 MWData checked 16 November 2026Source record dated 19 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Oaklands Farm is a 6.9 MW solar farm 5.2 km north-west of Ashford, Kent, United Kingdom. Its planning application (14/00326/AS) went to Ashford on 24 March 2014 and was granted on 20 June 2014. It has been operating since 30 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 32 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 321 energy sites within 40 km for Oaklands Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land north of Oaklands Farm, Pluckley Road, Hothfield, Kent, United Kingdom
Planning authority
Ashford
Planning application
14/00326/AS
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/00326/AS, with what the planning evidence pack adds for this site.

Every application in Ashford · Alerts for applications and incidents near here

  • 24 March 2014 Planning application submitted
  • 20 June 2014 Planning permission granted
  • 4 November 2014 Construction started
  • 30 March 2015 Operational

None found. The register holds no published incident that names Oaklands Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Oaklands Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Oaklands Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Oaklands Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 19 May 2015.
Where is Oaklands Farm?
5.2 km north-west of Ashford, Kent, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).