← Back to Angus
Planning pack for this site, £295Other options

Solar · United Kingdom

Montreathmont Moor Forest

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Revised42 MWData checked 16 November 2026Source record dated 5 August 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Montreathmont Moor Forest is a 42 MW solar farm 7.3 km south of Brechin, Angus, United Kingdom. Its planning application (15/00747/FULM) went to Angus on 3 August 2015 and was granted on 27 November 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 24 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Montreathmont Moor Forest sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 19 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie19 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline81 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School139 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
42 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Montreathmont Moor Forest, Montreathmont, Forfar, Tayside, Angus, DD8 2TU, United Kingdom
Planning authority
Angus
Planning application
15/00747/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/00747/FULM, with what the planning evidence pack adds for this site.

Every application in Angus · Alerts for applications and incidents near here

  • 3 August 2015 Planning application submitted
  • 27 November 2015 Planning permission granted
  • 27 November 2018 Planning permission expired

None found. The register holds no published incident that names Montreathmont Moor Forest. If you know of one, report it (confidential reports are anonymised).

Has Montreathmont Moor Forest had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Montreathmont Moor Forest; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Montreathmont Moor Forest?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2020.
Where is Montreathmont Moor Forest?
7.3 km south of Brechin, Angus, United Kingdom (postcode DD8 2TU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).