← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Antrim and Newtownabbey

Crookedstone Road

Operational4.8 MWApplication T/2014/0098/FSubmitted 24 March 2014Granted 8 September 2014

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
T/2014/0098/F
Planning authority
Antrim and Newtownabbey
County or area
Co. Antrim
Nation
Northern Ireland
Technology
Solar
Capacity
4.8 MW
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Location
Land West of no 24 Crookedstone Road Aldergrove
First operating
2016
  • 24 March 2014 Planning application submitted
  • 8 September 2014 Planning permission granted
  • 18 February 2016 Construction started
  • 31 May 2016 Operational

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 197 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07522024Storm Darragh damages newly commissioned Anglesey solar farm panels197 kmSignificant
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey197 kmMinor
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline233 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near Crookedstone Road is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Antrim and Newtownabbey.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.