Battery storage · United Kingdom
Battery Energy Storage System Facility in Antrim
Operator Heron Storage Limited
Awaiting Construction50 MWData checked 16 November 2026Source record dated 1 April 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Battery Energy Storage System Facility in Antrim is a 50 MW battery storage site 3.9 km south of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/2024/0351/F) went to Antrim and Newtownabbey on 16 May 2024 and was granted on 21 March 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 16 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Battery Energy Storage System Facility in Antrim changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
HERON STORAGE LIMITED (NI682405), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Battery Energy Storage System Facility in Antrim sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 259 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 259 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 377 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 437 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 50 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Heron Storage Limited
- Location
- Lands Approximately 550m S. of 99 Dublin Rd. and , 650m W. of 120 Dublin Road, Antrim, Co. Antrim, BT41 4SA, United Kingdom
- Planning authority
- Antrim and Newtownabbey
- Planning application
- LA03/2024/0351/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA03/2024/0351/F, with what the planning evidence pack adds for this site.
Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here
Timeline
- 16 May 2024 Planning application submitted
- 21 March 2025 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Battery Energy Storage System Facility in Antrim. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Battery Energy Storage System Facility in Antrim had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Battery Energy Storage System Facility in Antrim; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Battery Energy Storage System Facility in Antrim?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 April 2025.
- Where is Battery Energy Storage System Facility in Antrim?
- 3.9 km south of Antrim, Co. Antrim, United Kingdom (postcode BT41 4SA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).