← Back to Co. Antrim
Planning pack for this site, £295Other options

Onshore wind · United Kingdom

Wind Turbine Development in Antrim

Operator Heron Storage Limited

Awaiting ConstructionData checked 16 November 2026Source record dated 5 August 2025

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Wind Turbine Development in Antrim is a wind farm 7.6 km north of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/2024/0604/F) went to Antrim and Newtownabbey on 13 August 2024 and was granted on 18 June 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

HERON STORAGE LIMITED (NI682405), active, since 2021. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wind Turbine Development in Antrim sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 55 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm55 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire96 kmSignificant
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh100 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Heron Storage Limited
Location
Approximately 342m North East of No 92 Parkgate Road, Kells, Co. Antrim, BT42 3PG, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2024/0604/F
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/2024/0604/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 13 August 2024 Planning application submitted
  • 18 June 2025 Planning permission granted
  • 16 June 2030 Planning permission runs out

None found. The register holds no published incident that names Wind Turbine Development in Antrim. If you know of one, report it (confidential reports are anonymised).

Has Wind Turbine Development in Antrim had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wind Turbine Development in Antrim; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Wind Turbine Development in Antrim?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2025.
Where is Wind Turbine Development in Antrim?
7.6 km north of Antrim, Co. Antrim, United Kingdom (postcode BT42 3PG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).