Battery storage · United Kingdom

Kells Substation

Operator Kells Bes (ABO Wind)

Awaiting ConstructionData checked 16 November 2026Source record dated 21 April 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Kells Substation is a battery storage site 9.8 km south-east of Ballymena, Co. Tyrone, United Kingdom. Its planning application (LA03/2018/0984/F) went to Antrim and Newtownabbey on 25 October 2018 and was granted on appeal on 27 November 2019. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 29 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Kells Substation sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 263 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool263 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells379 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire444 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Status
Awaiting Construction (Appeal Granted)
Operator or applicant
Kells Bes (ABO Wind)
Location
Lands at, Doagh Road, Approximately 137m North East, Dungannon, Co. Tyrone, BT71 5BJ, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2018/0984/F
Appeal reference
2018/A0248

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/2018/0984/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 25 October 2018 Planning application submitted
  • 22 March 2019 Planning permission refused
  • 27 March 2019 Appeal lodged
  • 27 November 2019 Planning permission granted
  • 27 November 2019 Appeal granted
  • 27 November 2024 Planning permission expired

None found. The register holds no published incident that names Kells Substation. If you know of one, report it (confidential reports are anonymised).

Has Kells Substation had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Kells Substation; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Kells Substation?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 21 April 2020.
Where is Kells Substation?
9.8 km south-east of Ballymena, Co. Tyrone, United Kingdom (postcode BT71 5BJ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).