Battery storage · United Kingdom
Battery Energy Storage System Development in Ballymena
Operator Green Frog Power
Awaiting Construction79 MWData checked 16 November 2026Source record dated 10 November 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Battery Energy Storage System Development in Ballymena is a 79 MW battery storage site 9.7 km north of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/2024/0435/F) went to South Antrim on 14 June 2024 and was granted on 20 October 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 27 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Battery Energy Storage System Development in Ballymena changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Battery Energy Storage System Development in Ballymena sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 263 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 263 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 379 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 444 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 79 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Green Frog Power
- Location
- Lands Approximately 342m SE of Kells SubStn. and, Approximately 105m E. of 43, Kells, Ballymena, Co. Antrim, BT42 3PP, United Kingdom
- Planning authority
- South Antrim
- Planning application
- LA03/2024/0435/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA03/2024/0435/F, with what the planning evidence pack adds for this site.
Every application in South Antrim · Alerts for applications and incidents near here
Timeline
- 14 June 2024 Planning application submitted
- 20 October 2025 Planning permission granted
- 20 October 2030 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Battery Energy Storage System Development in Ballymena. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Battery Energy Storage System Development in Ballymena had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Battery Energy Storage System Development in Ballymena; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Battery Energy Storage System Development in Ballymena?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 10 November 2025.
- Where is Battery Energy Storage System Development in Ballymena?
- 9.7 km north of Antrim, Co. Antrim, United Kingdom (postcode BT42 3PP).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).