← Back to Co. Antrim
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Dunore Point Treatment Works

Operator NI Water · Owner Northern Ireland Water Limited

Awaiting Construction3 MWData checked 20 November 2026Source record dated 1 October 2020

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Dunore Point Treatment Works is a 3 MW battery storage site 4.7 km south-west of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/20/0858/F) went to Antrim and Newtownabbey on 2 December 2020 and was granted on 18 May 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 17 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

NI WATER CLEAR LIMITED (NI647548), active, since 2017. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dunore Point Treatment Works sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 260 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool260 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells378 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire437 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
NI Water
Owner
Northern Ireland Water Limited
Location
Adjacent to Dunore Point Treatment Works, Co. Antrim, BT29 4EA, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/20/0858/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/20/0858/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 2 December 2020 Planning application submitted
  • 18 May 2022 Planning permission granted
  • 18 May 2027 Planning permission runs out

None found. The register holds no published incident that names Dunore Point Treatment Works. If you know of one, report it (confidential reports are anonymised).

Has Dunore Point Treatment Works had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dunore Point Treatment Works; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dunore Point Treatment Works?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 1 October 2020.
Where is Dunore Point Treatment Works?
4.7 km south-west of Antrim, Co. Antrim, United Kingdom (postcode BT29 4EA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).