Solar · United Kingdom
Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm
Operator NI Water · Owner Northern Ireland Water Limited
Application Submitted5 MWData checked 20 November 2026Source record dated 3 March 2025
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm is a 5 MW solar farm 6.4 km north-east of Craigavon, Co. Armagh, United Kingdom. Its planning application (LA08/2025/0042/F) went to Armagh City, Banbridge and Craigavon on 13 January 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There is one other energy site within 10 km. The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
NI WATER CLEAR LIMITED (NI647548), active, since 2017. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 188 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0752 | 2024 | Storm Darragh damages newly commissioned Anglesey solar farm panels | 188 km | Significant |
| EIR-1400 | 2023 | Solar panel and battery fire at a bungalow on Anglesey | 190 km | Minor |
| EIR-2016 | 2022 | Solar panel fire evacuates Hawick High School | 249 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- NI Water
- Owner
- Northern Ireland Water Limited
- Location
- South of the Castor Bay Water Treatment Works, Castor Bay Road, Lurgan, Co. Armagh, BT67 9LF, United Kingdom
- Planning authority
- Armagh City, Banbridge and Craigavon
- Planning application
- LA08/2025/0042/F
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA08/2025/0042/F, with what the planning evidence pack adds for this site.
Every application in Armagh City, Banbridge and Craigavon · Alerts for applications and incidents near here
Timeline
- 13 January 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 3 March 2025.
- Where is Castor Bay Water Treatment Works, Castor Bay Road - Solar Farm?
- 6.4 km north-east of Craigavon, Co. Armagh, United Kingdom (postcode BT67 9LF).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).