← Back to Co. Antrim
Planning pack for this site, £295Other options

Solar · United Kingdom

Dunore Road, Aldergrove Solar Farm

Operator NI Water · Owner Northern Ireland Water Limited

Application Submitted3.8 MWData checked 20 November 2026Source record dated 12 April 2021

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Dunore Road, Aldergrove Solar Farm is a 3.8 MW solar farm 4.8 km south-west of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/2021/0252/F) went to Antrim and Newtownabbey on 3 March 2021. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 17 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

NI WATER CLEAR LIMITED (NI647548), active, since 2017. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Dunore Road, Aldergrove Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 199 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07522024Storm Darragh damages newly commissioned Anglesey solar farm panels199 kmSignificant
EIR-14002023Solar panel and battery fire at a bungalow on Anglesey200 kmMinor
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline234 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
3.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
NI Water
Owner
Northern Ireland Water Limited
Location
Lands adjacent to and west of Water Treatment works and approx. 120m north of 15 Dunore Road Aldergrove Crumlin, Co. Antrim, BT29 4EA, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2021/0252/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/2021/0252/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 3 March 2021 Planning application submitted

None found. The register holds no published incident that names Dunore Road, Aldergrove Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Dunore Road, Aldergrove Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Dunore Road, Aldergrove Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Dunore Road, Aldergrove Solar Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 12 April 2021.
Where is Dunore Road, Aldergrove Solar Farm?
4.8 km south-west of Antrim, Co. Antrim, United Kingdom (postcode BT29 4EA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).