← Back to Co. Antrim

Solar · United Kingdom

South Antrim Solar Park - Phase 1

Operator Hadstone Energy

Operational6.5 MWData checked 16 November 2026Source record dated 2 January 2019

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

South Antrim Solar Park - Phase 1 is a 6.5 MW solar farm on the edge of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/2015/0262/F) went to Antrim and Newtownabbey on 30 June 2015 and was granted on 26 April 2016. It has been operating since 10 May 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 15 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 4 other sites and 198 energy sites within 40 km for South Antrim Solar Park - Phase 1

Members see the sites and incidents around this one, and every record behind them.

HADSTONE ENERGY LIMITED (08213657), dissolved, since 2012. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Hadstone Energy
Location
Lands approx 550m South of, 99 Dublin Road, Antrim, Co. Antrim, BT41 4PN, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2015/0262/F
First operating
2018

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/2015/0262/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 30 June 2015 Planning application submitted
  • 26 April 2016 Planning permission granted
  • 10 March 2018 Construction started
  • 10 May 2018 Operational

None found. The register holds no published incident that names South Antrim Solar Park - Phase 1. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has South Antrim Solar Park - Phase 1 had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names South Antrim Solar Park - Phase 1; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of South Antrim Solar Park - Phase 1?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 January 2019.
Where is South Antrim Solar Park - Phase 1?
On the edge of Antrim, Co. Antrim, United Kingdom (postcode BT41 4PN).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).