Solar · United Kingdom
Steeple Road
Operator Elgin Energy Esco
Awaiting Construction25 MWData checked 16 November 2026Source record dated 2 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Steeple Road is a 25 MW solar farm 3.4 km north of Antrim, Co. Antrim, United Kingdom. Its planning application (LA03/2016/0135/F) went to Antrim and Newtownabbey on 10 February 2016 and was granted on appeal on 24 May 2018. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Steeple Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Steeple Road sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-0752, Storm Darragh damages newly commissioned Anglesey solar farm panels, 204 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0752 | 2024 | Storm Darragh damages newly commissioned Anglesey solar farm panels | 204 km | Significant |
| EIR-1400 | 2023 | Solar panel and battery fire at a bungalow on Anglesey | 204 km | Minor |
| EIR-1238 | 2019 | Leak from solar heating system at Carnegie Leisure Centre Dunfermline | 227 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 25 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Appeal Granted)
- Operator or applicant
- Elgin Energy Esco
- Location
- Lands extending north and south, 58 Niblock Road, Antrim, Co. Antrim, BT41 2JQ, United Kingdom
- Planning authority
- Antrim and Newtownabbey
- Planning application
- LA03/2016/0135/F
- Appeal reference
- 2016/A0240
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA03/2016/0135/F, with what the planning evidence pack adds for this site.
Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here
Timeline
- 10 February 2016 Planning application submitted
- 15 December 2016 Planning permission refused
- 22 March 2017 Appeal lodged
- 24 May 2018 Planning permission granted
- 24 May 2018 Appeal granted
- 24 May 2023 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Steeple Road. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Steeple Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Steeple Road; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Steeple Road?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 2 September 2020.
- Where is Steeple Road?
- 3.4 km north of Antrim, Co. Antrim, United Kingdom (postcode BT41 2JQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).