Rose And Crown Farm
Operator Elgin Energy EsCo
Operational30 MWData checked 16 November 2026Source record dated 21 June 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Rose And Crown Farm is a 30 MW solar farm 5.7 km north-east of Wisbech, Norfolk, United Kingdom. Its planning application (14/00283/FM) went to King's Lynn and West Norfolk on 25 February 2014 and was granted on appeal on 11 September 2015. It has been operating since 18 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 53 other energy sites within 10 km, 19 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Rose And Crown Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 30 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Elgin Energy EsCo
- Location
- Rose And Crown Farm Walpole Bank Walpole St Andrew Wisbech Norfolk PE14 7JB, Norfolk, United Kingdom
- Planning authority
- King's Lynn and West Norfolk
- Planning application
- 14/00283/FM
- Appeal reference
- APP/V2635/W/14/3001281
- First operating
- 2016
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 14/00283/FM, with what the planning evidence pack adds for this site.
Every application in King's Lynn and West Norfolk · Alerts for applications and incidents near here
Timeline
- 25 February 2014 Planning application submitted
- 12 June 2014 Planning permission refused
- 16 February 2015 Appeal lodged
- 11 September 2015 Planning permission granted
- 11 September 2015 Appeal granted
- 26 November 2015 Construction started
- 18 March 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Rose And Crown Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Rose And Crown Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Rose And Crown Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Rose And Crown Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 21 June 2016.
- Where is Rose And Crown Farm?
- 5.7 km north-east of Wisbech, Norfolk, United Kingdom.