Data centreUnited KingdomEIR-1885

Fire in BT Belfast data centre disrupts power and internet services

June 2015Published 2 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersLow confidence
out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden

A fire broke out shortly before 6am on 24 June 2015 on the fourth floor of Telephone House, a BT building on May Street in Belfast city centre. BT said the fire disrupted the electricity supply to the building, affecting a number of customers in its data centre. A tenant said the damage was isolated to one connectivity room on the fourth floor that feeds the main data centre space.

Several businesses and public bodies, including Translink, Belfast City Council and the Police Ombudsman's Office, reported that their websites were unavailable. BT said the impact was limited to affected customers. Firefighters from the Northern Ireland Fire and Rescue Service attended with five appliances and an aerial ladder, and buildings in the area were evacuated. Power to the facility was reportedly shut down during the response and restored after 1pm; BT has not confirmed this. A tenant reported that two power distribution units serving its servers were damaged when power returned. BT reported no injuries.

The cause had not been established at the time of reporting. BT said it was under investigation, and the fire service treated the fire as accidental. A tenant said power was returned without notification and that this damaged two power distribution units. BT has not confirmed this account.

  1. Operators should agree a controlled power restoration procedure with tenants after firefighting isolations, including advance notice of re-energisation.
  2. Shared buildings should map single points of failure in connectivity and power rooms, so that one fire does not disconnect many customers.
  3. Power distribution units and downstream equipment should be checked for surge or fault damage before full load is restored.

More lessons on worker safety and safe systems of work, outages, backup supply and restoration, from every incident on the register.

Published 2026-10-02. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Data centre incidents in the United Kingdom, by year, free with a credit (PNG).

Data centre incidents in the United Kingdom: 21 entries, with a free alert for the next one.

Browse the full register or submit an incident.