Onshore wind · United Kingdom
Upper Hightown Road
Operator Hill Power
Application Refused0.2 MWData checked 16 November 2026Source record dated 16 March 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Upper Hightown Road is a 0.2 MW wind farm 4.4 km west of Newtownabbey, Co. Antrim, United Kingdom. Its planning application (LA04/2020/0595/F) went to Belfast on 6 March 2020 and was refused on 23 January 2023. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 22 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Upper Hightown Road changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
HILL POWER LIMITED (OE035310), registered, since 2026. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Hill Power
- Location
- 510m north/north west if, 33 Upper Hightown Road, Ballysillan, Belfast, Co. Antrim, BT14 8RR, United Kingdom
- Planning authority
- Belfast
- Planning application
- LA04/2020/0595/F
- Turbines
- 1, 100 m to tip
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for LA04/2020/0595/F, with what the planning evidence pack adds for this site.
Every application in Belfast · Alerts for applications and incidents near here
Timeline
- 6 March 2020 Planning application submitted
- 23 January 2023 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Upper Hightown Road. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Upper Hightown Road had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Upper Hightown Road; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Upper Hightown Road?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 March 2023.
- Where is Upper Hightown Road?
- 4.4 km west of Newtownabbey, Co. Antrim, United Kingdom (postcode BT14 8RR).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).