Onshore wind · United Kingdom

Ballyutoag Wind Farm

Operator BSI Wind (formerly TCI Renewables)

Awaiting Construction11.5 MWData checked 16 November 2026Source record dated 23 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ballyutoag Wind Farm is a 11.5 MW wind farm 7.7 km west of Newtownabbey, Co. Antrim, United Kingdom. Its planning application (T/2014/0478/F) went to Antrim and Newtownabbey on 8 December 2014 and was granted on 23 December 2015. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 24 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Ballyutoag Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1038, Wind turbine reported to have collapsed in Northern Ireland during severe storm, 60 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-10382017Wind turbine reported to have collapsed in Northern Ireland during severe storm60 kmSignificant
EIR-11342017Wind turbine tower collapses at Kilgallioch Wind Farm, Ayrshire94 kmSignificant
EIR-04222025Wind turbine fire prompts fire service response in Fermanagh104 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
11.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
BSI Wind (formerly TCI Renewables)
Location
Land approximately 1km north of No. 71 Ballyutoag Road, Belfast, Co. Antrim, Co. Antrim, BT14 8SS, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
T/2014/0478/F
Turbines
5, 93 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for T/2014/0478/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 8 December 2014 Planning application submitted
  • 23 December 2015 Planning permission granted
  • 21 December 2020 Planning permission expired

None found. The register holds no published incident that names Ballyutoag Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Ballyutoag Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ballyutoag Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ballyutoag Wind Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 23 September 2020.
Where is Ballyutoag Wind Farm?
7.7 km west of Newtownabbey, Co. Antrim, United Kingdom (postcode BT14 8SS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).