Interxion London data centre power outage halts electronic LME trading
Jan 2022Published 4 Oct 2026Updated 13 Oct 2026Responsible editor: Chief Editor
Get the next one by email
Free alerts on data centre incidents in the United Kingdom, and an email when EIR-1994 is updated. No account needed; unsubscribe in one click.
Confirm your email and every data centre incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Companies named in the reporting of this entry (being named is not a finding of fault): Interxion
What happened
On Monday 10 January 2022, at about 1810 UTC, a critical power interruption struck Interxion's Hanbury Street facility, known as LON1, in East London. According to the operator, the interruption affected some of the mains control equipment and caused outages across services in the facility. Reporting indicated that multiple mains power feeds failed and that the electronic switchgear meant to transfer the load to on-site backup generators also failed, so the site could not switch between mains and generator supply.
Services began returning at 1945 and the facility was back in operational status by 2230. Customers affected included the London Metal Exchange, whose electronic trading was unavailable for around five hours, although traders could still trade by phone, and cloud hosting provider Vultr, which reported outages in London. Customers complained of poor communication during the incident.
Contributing factors
Reports said multiple mains feeds failed at the same time despite redundant supply, and that the switchgear did not transfer the site to backup generators. The root cause had not been established at the time of reporting. Customers said the operator did not communicate effectively during the outage, and customers reported being told that the operator's customer support systems were also affected.
Lessons learned
- Test automatic transfer switchgear under load and confirm that a failed transfer raises an alarm and has a tested manual fallback.
- Do not assume redundant feeds are independent until checked for shared fault paths and shared control equipment.
- Keep out-of-band customer communication channels that work when the facility's own support systems are down.
More lessons on detection and monitoring, from every incident on the register.
Source
Site page: Verne Global London Data Centre (status, dates and other incidents)
Published 2026-10-04. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.