Solar · United Kingdom

Coldham Estate Solar Farm

Operator ScottishPower Renewables · Owner Scottishpower Renewable Energy Limited

Planning Permission Expired10 MWData checked 16 November 2026Source record dated 7 October 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Coldham Estate Solar Farm is a 10 MW solar farm 5.8 km north-east of March, Cambridgeshire, United Kingdom. Its planning application (F/YR19/0810/F) went to Fenland on 17 September 2019 and was granted on 17 December 2019. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 30 other energy sites within 10 km, 12 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 22 other sites and 341 energy sites within 40 km for Coldham Estate Solar Farm

Members see the sites and incidents around this one, and every record behind them.

SCOTTISHPOWER RENEWABLES (UK) LIMITED (NI028425), active, since 1994. 3 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
ScottishPower Renewables
Owner
Scottishpower Renewable Energy Limited
Location
Solar Farm, March Road, Coldham, Wisbech, Cambridgeshire, Cambridgeshire, PE14 0LY, United Kingdom
Planning authority
Fenland
Planning application
F/YR19/0810/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR19/0810/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 17 September 2019 Planning application submitted
  • 17 December 2019 Planning permission granted
  • 17 December 2022 Planning permission expired

None found. The register holds no published incident that names Coldham Estate Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Coldham Estate Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Coldham Estate Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Coldham Estate Solar Farm?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 7 October 2020.
Where is Coldham Estate Solar Farm?
5.8 km north-east of March, Cambridgeshire, United Kingdom (postcode PE14 0LY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).