Onshore wind · United Kingdom

MARCH SEWAGE TREATMENT WORKS - WIND TURBINE

Operator TCI Renewables

Operational2 MWData checked 16 November 2026Source record dated 29 April 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

MARCH SEWAGE TREATMENT WORKS - WIND TURBINE is a 2 MW wind farm 3.2 km north-east of March, Cambridgeshire, United Kingdom. Its planning application (F/YR07/0742/F) went to Fenland on 18 July 2007 and was granted on appeal on 20 February 2009. It has been operating since 1 September 2012. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 350 energy sites within 40 km for MARCH SEWAGE TREATMENT WORKS - WIND TURBINE

Members see the sites and incidents around this one, and every record behind them.

TCI RENEWABLES LIMITED (05360262), active, since 2005. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
TCI Renewables
Location
Anglian Water Authority, Creek Road, March, Cambridgeshire PE15 8RY, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
F/YR07/0742/F
Appeal reference
APP/D0515/A/08/2089046
First operating
2012
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR07/0742/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 18 July 2007 Planning application submitted
  • 2 May 2008 Planning permission refused
  • 20 February 2009 Planning permission granted
  • 20 February 2009 Appeal granted
  • 25 June 2012 Construction started
  • 1 September 2012 Operational

None found. The register holds no published incident that names MARCH SEWAGE TREATMENT WORKS - WIND TURBINE. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has MARCH SEWAGE TREATMENT WORKS - WIND TURBINE had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names MARCH SEWAGE TREATMENT WORKS - WIND TURBINE; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of MARCH SEWAGE TREATMENT WORKS - WIND TURBINE?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 April 2013.
Where is MARCH SEWAGE TREATMENT WORKS - WIND TURBINE?
3.2 km north-east of March, Cambridgeshire, United Kingdom.