Onshore wind · United Kingdom
Stags Holt Extension
Operator E.ON UK
Operational2 MWData checked 16 November 2026Source record dated 8 July 2013
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Stags Holt Extension is a 2 MW wind farm 3.1 km north-east of March, Cambridgeshire, United Kingdom. Its planning application (F/YR07/0602/F) went to Fenland on 4 June 2007 and was granted on 7 October 2008. It has been operating since 31 December 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Stags Holt Extension changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
E.ON UK LIMITED (02366970), active, since 1989. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 2 MW (this record)
- All phases
- 20 MW, the phases on the register added up
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- E.ON UK
- Location
- Franks Farm, Stags Holt, Coldham Bank Road, March, Cambridgeshire, PE15 0BS, Cambridgeshire, United Kingdom
- Planning authority
- Fenland
- Planning application
- F/YR07/0602/F
- First operating
- 2010
- Turbines
- 1
This record is 2 MW, one part of a site built in phases. With Stags Holt (18 MW) the phases on the register add up to 20 MW. Stags Holt
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/YR07/0602/F, with what the planning evidence pack adds for this site.
Every application in Fenland · Alerts for applications and incidents near here
Timeline
- 4 June 2007 Planning application submitted
- 7 October 2008 Planning permission granted
- 31 December 2010 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Stags Holt Extension. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Stags Holt Extension had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Stags Holt Extension; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Stags Holt Extension?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2013.
- Where is Stags Holt Extension?
- 3.1 km north-east of March, Cambridgeshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).