Onshore wind · United Kingdom

Stags Holt

Operator Powergen & Wind Prospects

Operational18 MWData checked 16 November 2026Source record dated 6 May 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Stags Holt is a 18 MW wind farm 3.1 km north-east of March, Cambridgeshire, United Kingdom. Its planning application (F/YR01/1269/F) went to Fenland on 21 December 2001 and was granted on 23 May 2002. It has been operating since 1 October 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 10 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

351 energy sites within 40 km for Stags Holt

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
18 MW (this record)
All phases
20 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Powergen & Wind Prospects
Location
MarchCambridgeshire, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
F/YR01/1269/F
First operating
2007
Turbines
9

This record is 18 MW, one part of a site built in phases. With Stags Holt Extension (2 MW) the phases on the register add up to 20 MW. Stags Holt Extension

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR01/1269/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 21 December 2001 Planning application submitted
  • 23 May 2002 Planning permission granted
  • 1 April 2007 Construction started
  • 1 October 2007 Operational

None found. The register holds no published incident that names Stags Holt. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Stags Holt had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Stags Holt; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Stags Holt?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2009.
Where is Stags Holt?
3.1 km north-east of March, Cambridgeshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).