Planning application · Solar · Fenland

Coldham Estate Solar Farm

Planning Permission Expired10 MWApplication F/YR19/0810/FSubmitted 17 September 2019Granted 17 December 2019

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
F/YR19/0810/F
Planning authority
Fenland
County or area
Cambridgeshire
Nation
England
Technology
Solar
Capacity
10 MW
Status
Planning Permission Expired
Operator or applicant
ScottishPower Renewables
Location
Solar Farm, March Road, Coldham, Wisbech, Cambridgeshire, PE14 0LY
  • 17 September 2019 Planning application submitted
  • 17 December 2019 Planning permission granted
  • 17 December 2022 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 25 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11552024Rooftop solar fire contained on a Peterborough warehouse roof25 kmSignificant
EIR-12622024Fire reported on solar-panel roof at Fitzwilliam College auditorium44 kmMinor
EIR-07642024Transformer smoking at solar farm in Burton Pedwardine52 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near PE14 0LY is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Fenland.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.