Wind (onshore)United KingdomEIR-0895

Wind turbine catches fire at Doddington wind farm after storms

May 2018Published 16 Sept 2026Responsible editor: Chief Editor

Estimated damageEstimated by the register's adjusterHow? Know the real figure?
Figure hidden: shown to subscribersMedium confidence
turbine out of service for about •• daysShown in the record →Full estimate
From the recordRoot cause hiddenFailed part hidden
Where
Ransonmoor Wind Farm in Doddington, Cambridgeshire
Operator
Siemens Gamesa
What
Wind turbine caught fire at the top after storms
Injuries
None reported
Cause
Under investigation

Companies named in the reporting of this entry (being named is not a finding of fault): Siemens Gamesa

An 89 metre wind turbine at Ransonmoor Wind Farm in Doddington, Cambridgeshire, caught fire at the top of the turbine following overnight storms during which residents reported thunder and lightning. Firefighters were called at about 07:50 BST. Cambridgeshire Fire and Rescue Service attended and placed crews on standby, but the fire was allowed to burn out safely and required no action from them. Parts of the turbine broke off during the fire, with debris scattered in the area, though the fire service said there was no danger to the public.

Siemens Gamesa, which oversees operation and maintenance of the turbines at the site, confirmed there were no injuries to any member of the public or to any employees. The company said its engineers were investigating the incident. The cause of the fire was not known at the time of reporting.

Storms with lightning activity were reported across the Fens shortly before the fire was discovered, but no cause had been confirmed and the incident was under investigation.

  1. Lightning protection systems and down-conductor paths on wind turbines should be inspected on a defined schedule after storms.
  2. Fire services may allow a nacelle fire at height to burn out safely, so site plans must set out this approach in advance.
  3. Burning turbines can shed components, so exclusion zones must be set promptly even when public risk is low.

More lessons on weather and external hazards, structural integrity and turbines, emergency response and public communication, from every incident on the register.

  • Turbine model and age
  • Cost of the damage
  • Length of downtime

This entry is updated when these are reported. Get an alert for the next one like it.

Published 2026-09-16. Written from public reporting. Descriptive, not investigative. See the data accuracy disclaimer.

See the register's stories first in Google: add it as a preferred source.

Chart to reuse with this story: Wind (onshore) incidents in the United Kingdom, by year, free with a credit (PNG).

Wind (onshore) incidents in the United Kingdom: 48 entries, with a free alert for the next one.

Wind turbine fires: the counts, the latest entries and a free alert for the next one. Also: lightning strikes on energy assets.

Browse the full register or submit an incident.