← Back to Cambridgeshire

Energy sites / United Kingdom / Cambridgeshire

Onshore wind · United Kingdom

Ranson Moor (phase 1)

Operational6 MWChecked 6 October 2026Last changed in the dataset 6 May 2009

Technology
Onshore wind
Capacity
6 MW
Status
Operational
Operator or applicant
Fenpower Limited
Location
Land North of ransonmoor Farm Benwick Road Doddington Cambs, Cambridgeshire, PE15 0TY, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
F/YR03/0990/F
First operating
2007
Turbines
3

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

  • 31 July 2003 Planning application submitted
  • 25 April 2005 Planning permission granted
  • 1 September 2006 Construction started
  • 1 May 2007 Operational

None found. The register holds no published incident that names Ranson Moor (phase 1). If you know of one, report it (confidential reports are anonymised).

The register holds 54 incidents at onshore wind farms in the United Kingdom, 22 of them fires, and 297 worldwide. Counts of incidents in published reporting, not rates.

What fails at onshore wind farms

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.