Onshore wind · United Kingdom

Ranson Moor (phase 1)

Operator Fenpower Limited

Operational6 MWData checked 16 November 2026Source record dated 6 May 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ranson Moor (phase 1) is a 6 MW wind farm 5.8 km south-west of March, Cambridgeshire, United Kingdom. Its planning application (F/YR03/0990/F) went to Fenland on 31 July 2003 and was granted on 25 April 2005. It has been operating since 1 May 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 29 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

392 energy sites within 40 km for Ranson Moor (phase 1)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
6 MW (this record)
All phases
10 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fenpower Limited
Location
Land North of ransonmoor Farm Benwick RoadDoddingtonCambs, Cambridgeshire, PE15 0TY, Cambridgeshire, United Kingdom
Planning authority
Fenland
Planning application
F/YR03/0990/F
First operating
2007
Turbines
3

This record is 6 MW, one part of a site built in phases. With Ranson Moor Wind Farm (Phase 2) (4 MW) the phases on the register add up to 10 MW. Ranson Moor Wind Farm (Phase 2)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR03/0990/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 31 July 2003 Planning application submitted
  • 25 April 2005 Planning permission granted
  • 1 September 2006 Construction started
  • 1 May 2007 Operational

None found. The register holds no published incident that names Ranson Moor (phase 1). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ranson Moor (phase 1) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ranson Moor (phase 1); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ranson Moor (phase 1)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2009.
Where is Ranson Moor (phase 1)?
5.8 km south-west of March, Cambridgeshire, United Kingdom.