Solar · United Kingdom
Linwood Farm, Linwood Lane - Solar Panels
Operator BeBa Energy UK Limited · Owner Low Energy Systems Limited
Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 8 February 2023
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Linwood Farm, Linwood Lane - Solar Panels is a 0.4 MW solar farm 3.2 km south of March, Cambridgeshire, United Kingdom. Its planning application (F/YR22/1375/PNSOL) went to Fenland on 8 December 2022 and was granted on 2 February 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 34 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Linwood Farm, Linwood Lane - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
BEBA ENERGY UK LTD (07092296), active, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Linwood Farm, Linwood Lane - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1155, Rooftop solar fire contained on a Peterborough warehouse roof, 22 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1155 | 2024 | Rooftop solar fire contained on a Peterborough warehouse roof | 22 km | Significant |
| EIR-1262 | 2024 | Fire reported on solar-panel roof at Fitzwilliam College auditorium | 36 km | Minor |
| EIR-1493 | 2026 | Solar panels catch fire on Bedford warehouse roof | 53 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.4 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- BeBa Energy UK Limited
- Owner
- Low Energy Systems Limited
- Location
- Linwood Farm Linwood Lane, Cambridgeshire, PE15 0YG, United Kingdom
- Planning authority
- Fenland
- Planning application
- F/YR22/1375/PNSOL
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/YR22/1375/PNSOL, with what the planning evidence pack adds for this site.
Every application in Fenland · Alerts for applications and incidents near here
Timeline
- 8 December 2022 Planning application submitted
- 2 February 2023 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Linwood Farm, Linwood Lane - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Linwood Farm, Linwood Lane - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Linwood Farm, Linwood Lane - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Linwood Farm, Linwood Lane - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 February 2023.
- Where is Linwood Farm, Linwood Lane - Solar Panels?
- 3.2 km south of March, Cambridgeshire, United Kingdom (postcode PE15 0YG).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).