Willow Farm

Operator BeBa Energy UK Limited · Owner Low Energy Systems Limited

Operational1.2 MWData checked 16 November 2026Source record dated 5 August 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Willow Farm is a 1.2 MW solar farm 8.3 km north-west of Littleport, Cambridgeshire, United Kingdom. Its planning application (F/YR21/0041/F) went to Fenland on 13 January 2021 and was granted on 12 November 2021. It has been operating since 15 August 2022. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 5 other energy sites within 10 km, 3 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 21 other sites and 366 energy sites within 40 km for Willow Farm

Members see the sites and incidents around this one, and every record behind them.

BEBA ENERGY UK LTD (07092296), active, since 2009. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
BeBa Energy UK Limited
Owner
Low Energy Systems Limited
Location
Willow Farm, Wisbech Road, Manea, Cambridgeshire, PE15 0HP, United Kingdom
Planning authority
Fenland
Planning application
F/YR21/0041/F
First operating
2022

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for F/YR21/0041/F, with what the planning evidence pack adds for this site.

Every application in Fenland · Alerts for applications and incidents near here

  • 13 January 2021 Planning application submitted
  • 12 November 2021 Planning permission granted
  • 15 August 2022 Operational

None found. The register holds no published incident that names Willow Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Willow Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Willow Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Willow Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 5 August 2022.
Where is Willow Farm?
8.3 km north-west of Littleport, Cambridgeshire, United Kingdom (postcode PE15 0HP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).