Onshore wind · United Kingdom
Coldham
Operator Wind Prospect & TXU
Operational16 MWData checked 16 November 2026Source record dated 11 April 2011
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Coldham is a 16 MW wind farm 5.1 km north of March, Cambridgeshire, United Kingdom. Its planning application (F/99/0410/F) went to Fenland on 2 August 1999 and was granted on 7 October 2004. It has been operating since 1 November 2005. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 31 other energy sites within 10 km, 8 of them wind farms. The register holds one incident at this site, the latest in 2025.
Incidents on the register at this site
A wind turbine caught fire at Coldham Wind Farm, near Wisbech, in Cambridgeshire, UK. The site is operated and owned by ScottishPower Renewables, with turbines manufactured by Vestas. The incident was reported by a local news outlet in early February 2025. No...
Matched by the site's name in the entry's own reporting. If one is wrong, tell the editor.
Get an email when Coldham changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 16 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Wind Prospect & TXU
- Location
- Cws Coldham Estate, March, Cambridgeshire, Cambridgeshire, United Kingdom
- Planning authority
- Fenland
- Planning application
- F/99/0410/F
- First operating
- 2005
- Turbines
- 8
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for F/99/0410/F, with what the planning evidence pack adds for this site.
Every application in Fenland · Alerts for applications and incidents near here
Timeline
- 2 August 1999 Planning application submitted
- 7 October 2004 Planning permission granted
- 1 November 2005 Operational
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Coldham had a fire or other incident?
- Yes. The register holds one incident that names it: Turbine fire at Coldham Wind Farm near Wisbech, Cambridgeshire (EIR-0535, 2025).
- What is the status of Coldham?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 11 April 2011.
- Where is Coldham?
- 5.1 km north of March, Cambridgeshire, United Kingdom.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).