Solar · United Kingdom
Start Road Industrial Park, Star Road - Solar Panels
Operator Forza Doors Limited
Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 14 February 2024
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Start Road Industrial Park, Star Road - Solar Panels is a 0.2 MW solar farm 8 km north of Steyning, West Sussex, United Kingdom. Its planning application (DC/23/2184) went to Horsham on 18 December 2023 and was granted on 9 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Start Road Industrial Park, Star Road - Solar Panels changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Start Road Industrial Park, Star Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1522, Fire damages roof with one solar panel in The Charltons, 17 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1522 | 2026 | Fire damages roof with one solar panel in The Charltons | 17 km | Minor |
| EIR-1527 | 2023 | Fire affects solar panels on nursing home roof in Woodingdean | 21 km | Minor |
| EIR-1303 | 2017 | Solar panel inverter fault destroys two Lewes homes | 23 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 0.2 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Forza Doors Limited
- Location
- Unit 22, Start Road Industrial Park, Star Road, Partridge Green, Horsham, West Sussex, RH13 8RA, United Kingdom
- Planning authority
- Horsham
- Planning application
- DC/23/2184
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for DC/23/2184, with what the planning evidence pack adds for this site.
Every application in Horsham · Alerts for applications and incidents near here
Timeline
- 18 December 2023 Planning application submitted
- 9 February 2024 Planning permission granted
Incidents on the register at this site
None found. The register holds no published incident that names Start Road Industrial Park, Star Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Start Road Industrial Park, Star Road - Solar Panels had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Start Road Industrial Park, Star Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Start Road Industrial Park, Star Road - Solar Panels?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 February 2024.
- Where is Start Road Industrial Park, Star Road - Solar Panels?
- 8 km north of Steyning, West Sussex, United Kingdom (postcode RH13 8RA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).