← Back to West Sussex
Planning pack for this site, £295Other options

Solar · United Kingdom

Start Road Industrial Park, Star Road - Solar Panels

Operator Forza Doors Limited

Awaiting Construction0.2 MWData checked 16 November 2026Source record dated 14 February 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Start Road Industrial Park, Star Road - Solar Panels is a 0.2 MW solar farm 8 km north of Steyning, West Sussex, United Kingdom. Its planning application (DC/23/2184) went to Horsham on 18 December 2023 and was granted on 9 February 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 32 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Start Road Industrial Park, Star Road - Solar Panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1522, Fire damages roof with one solar panel in The Charltons, 17 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15222026Fire damages roof with one solar panel in The Charltons17 kmMinor
EIR-15272023Fire affects solar panels on nursing home roof in Woodingdean21 kmMinor
EIR-13032017Solar panel inverter fault destroys two Lewes homes23 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Forza Doors Limited
Location
Unit 22, Start Road Industrial Park, Star Road, Partridge Green, Horsham, West Sussex, RH13 8RA, United Kingdom
Planning authority
Horsham
Planning application
DC/23/2184

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DC/23/2184, with what the planning evidence pack adds for this site.

Every application in Horsham · Alerts for applications and incidents near here

  • 18 December 2023 Planning application submitted
  • 9 February 2024 Planning permission granted

None found. The register holds no published incident that names Start Road Industrial Park, Star Road - Solar Panels. If you know of one, report it (confidential reports are anonymised).

Has Start Road Industrial Park, Star Road - Solar Panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Start Road Industrial Park, Star Road - Solar Panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Start Road Industrial Park, Star Road - Solar Panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 14 February 2024.
Where is Start Road Industrial Park, Star Road - Solar Panels?
8 km north of Steyning, West Sussex, United Kingdom (postcode RH13 8RA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).